公开(公告)号:US08326664B2
公开(公告)日:2012-12-04
申请号:US13151540
申请日:2011-06-02
Applicant: Yoshibumi Fukuda , Takeshi Yokota , Kenichirou Yamane , Kenji Akagi , Kensuke Morita
Inventor: Yoshibumi Fukuda , Takeshi Yokota , Kenichirou Yamane , Kenji Akagi , Kensuke Morita
IPC: G06Q10/00
CPC classification number: G06Q10/06 , G06Q10/063116 , G06Q10/063118 , G06Q10/1097
Abstract: A carry-in ready period calculation part calculates a candidate of a carry-in ready period which is a period during which a carry-in operation can be conducted and outputs the candidate in an output part so as to make entire construction works efficient. The calculation is performed based on a site arrival time schedule which is a time schedule showing when a carry-in target equipment arrives at a site, a temporary placement time schedule which is a time schedule showing when the equipment arrived is temporarily placed, and a construction time schedule of a building in which the equipment is carried.
Abstract translation: 进入就绪期间计算部分计算作为可以进行携带操作的期间的入库就绪期间的候选,并且在输出部输出候选,以使整个构造工作有效。 该计算是基于作为进入目标设备到达现场的时间表的站点到达时间表进行的,作为暂时放置设备到达时间的时间表的临时放置时间表,和 设备运载的建筑物的施工时间表。
-
公开(公告)号:US20110301995A1
公开(公告)日:2011-12-08
申请号:US13151540
申请日:2011-06-02
Applicant: Yoshibumi Fukuda , Takeshi Yokota , Kenichirou Yamane , Kenji Akagi , Kensuke Morita
Inventor: Yoshibumi Fukuda , Takeshi Yokota , Kenichirou Yamane , Kenji Akagi , Kensuke Morita
IPC: G06Q10/00
CPC classification number: G06Q10/06 , G06Q10/063116 , G06Q10/063118 , G06Q10/1097
Abstract: A carry-in ready period calculation part calculates a candidate of a carry-in ready period which is a period during which a carry-in operation can be conducted and outputs the candidate in an output part so as to make entire construction works efficient. The calculation is performed based on a site arrival time schedule which is a time schedule showing when a carry-in target equipment arrives at a site, a temporary placement time schedule which is a time schedule showing when the equipment arrived is temporarily placed, and a construction time schedule of a building in which the equipment is carried.
Abstract translation: 进入就绪期间计算部分计算作为可以进行携带操作的期间的入库就绪期间的候选,并且在输出部输出候选,以使整个构造工作有效。 该计算是基于作为进入目标设备到达现场的时间表的站点到达时间表进行的,作为暂时放置设备到达时间的时间表的临时放置时间表,和 设备运载的建筑物的施工时间表。