Abstract:
A method for completing a wellbore in a subsurface formation includes providing a sand screen assembly representing one or more joints of sand screen, joint assembly, and packer assembly. The packer assembly has at least one mechanically-set packer with at least one alternate flow channel. The sand screen assembly and joint assembly also each have transport conduits for carrying gravel slurry, and packing conduits for delivering gravel slurry. The method also includes running the sand screen assembly, connected joint assembly and packer assembly into the wellbore, and setting a sealing element of the packer assembly into engagement with the surrounding wellbore. Thereafter, the method includes injecting gravel slurry into the wellbore to form a gravel pack such that a reserve of gravel packing material is placed above the sand screen assembly. A wellbore completion apparatus is also provided that allows for placement of the gravel reserve.
Abstract:
A hybrid sand control system is provided herein. The sand control system is designed to reside and operate within a wellbore, preferably a wellbore that has been completed horizontally. The system utilizes compliant and non-compliant sand control assemblies placed in the wellbore across one or more zones of interest. The system has particular utility in connection with the control of sand migration across these zones within a surrounding open-hole portion of a wellbore. A method for completing a wellbore in a subsurface formation using the hybrid sand control system is also provided herein.
Abstract:
Systems and methods for providing zonal isolation in a hydrocarbon well include or utilize a tubular assembly having an upstream manifold, a gravel packing conduit, a transport conduit, a leak-off conduit, and a downstream flow path. The tubular assembly is adapted to receive a gravel-laden slurry and to direct at least a portion of the same to the gravel packing conduit. The gravel-laden slurry exiting the gravel packing conduit packs the annulus between the tubular assembly and the wellbore by dehydrating at least in part through the leak-off conduit. The leak-off conduit is further gravel-packed by the gravel-laden slurry received by the tubular assembly. The leak-off conduit is dehydrated through a flow control valve. Together, the gravel packed annulus and the gravel packed leak-off conduit provide a gravel-based zonal isolation system.
Abstract:
A wellbore apparatus and method comprising a first wellbore tool having a primary flow path and at least one secondary flow path and a second wellbore tool having a primary flow path and secondary flow path. A radial center of the primary flow path in the first wellbore tool is offset from a radial center of the primary flow path in the second wellbore tool which comprises a crossover joint connecting the first wellbore tool to the second wellbore tool having a primary flow path fluidly connecting the primary flow path of the first wellbore tool to the primary flow path of the second wellbore tool, and at least one secondary flow path fluidly connecting the at least one secondary flow path of the first wellbore tool to the at least one secondary flow path of the second wellbore tool.
Abstract:
A method for stimulating a multi-zone wellbore completed with a string of production casing, including pumping a first volume of acidic fluid into the wellbore under pressure, and then injecting the first volume of acidic fluid into a first zone of interest along the production casing dropping at least one plug into the wellbore, the plug being fabricated from a material that substantially dissolves in the presence of the acidic fluid at or over a selected period of time.
Abstract:
A system for stimulating a multi-zone well includes a tubular body apportioned into at least a first zone and a second zone. The system has a first set of plugs placed in pre-drilled holes along the tubular body within the first zone. The plugs in the first set of plugs are fabricated to substantially dissolve upon contact with an acidic stimulation fluid within a first selected time. The system also has a second set of plugs placed in pre-drilled holes along the tubular body within the second zone. The plugs in the second set of plugs are fabricated to substantially dissolve upon contact with the acidic fluid within a second selected time that is greater than the first selected time.
Abstract:
A method associated with the production of hydrocarbons is described. The method includes drilling a wellbore using a drilling fluid, conditioning the drilling fluid, running a production string in the wellbore and gravel packing an interval of the wellbore with a carrier fluid. The production string includes a joint assembly comprising a main body portion having primary and secondary fluid flow paths, wherein the main body portion is attached to a load sleeve assembly at one end and a torque sleeve assembly at the opposite end, the load sleeve assembly having at least one transport conduit and at least one packing conduit disposed therethrough. The main body portion may include a sand control device, a packer, or other well tool for use in a downhole environment. The joint assembly also includes a coupling assembly having a manifold region in fluid flow communication with the second fluid flow path of the main body portion and facilitating the make-up of first and second joint assemblies with a single connection.
Abstract:
A method and system associated with the production of hydrocarbons comprising a joint assembly comprising a main body portion having primary and secondary fluid flow paths, wherein the main body portion is attached to a load sleeve assembly at one end and a torque sleeve assembly at the opposite end. The load sleeve may include at least one transport conduit and at least one packing conduit. The main body portion may include a sand control device, a packer, or other well tool for use in a downhole environment. Included is a coupling assembly having a manifold region in fluid flow communication with the second fluid flow path of the main body portion and facilitating the make-up of first and second joint assemblies with a single connection.
Abstract:
A method associated with the production of hydrocarbons is described. The method includes drilling a wellbore using a drilling fluid, conditioning the drilling fluid, running a production string in the wellbore and gravel packing an interval of the wellbore with a carrier fluid. The production string includes a joint assembly comprising a main body portion having primary and secondary fluid flow paths, wherein the main body portion is attached to a load sleeve assembly at one end and a torque sleeve assembly at the opposite end, the load sleeve assembly having at least one transport conduit and at least one packing conduit disposed therethrough. The main body portion may include a sand control device, a packer, or other well tool for use in a downhole environment. The joint assembly also includes a coupling assembly having a manifold region in fluid flow communication with the second fluid flow path of the main body portion and facilitating the make-up of first and second joint assemblies with a single connection.
Abstract:
A method, system and apparatus associated with the production of hydrocarbons are described. One apparatus includes a swellable packer element around a primary and a secondary flow path, wherein the packer is configured to block flow in a portion of a wellbore annulus. One method includes disposing sand control devices having shunt tubes and a packer within a wellbore adjacent to a subsurface reservoir. The packer is then set within an interval, which may be an open-hole section of the wellbore. With the packer set, gravel packing of the sand control devices in different intervals may be performed. Then, hydrocarbons are produced from the wellbore by passing hydrocarbons through the sand control devices with the different intervals providing zonal isolation. In some embodiments, intervals may be alternatively packed and plugged, wherein the plugged intervals are not packed. In addition, the method may also include disposing the sand control devices and packer into the wellbore in conditioned drilling fluid. The conditioned drilling fluid may be displaced adjacent to the sand control devices by a carrier fluid. Again, once the packer is set, the gravel packing the intervals with the carrier fluid having gravel may be performed.