摘要:
A method for generating data of plant construction simulation, in which a scheduling system and a CAD system are used to prepare a construction plan, comprises steps of:managing a construction work managed by said scheduling system and a plant part used in the construction work and managed by the CAD system in association with each other; andperforming processing for associating the plant part with each of a plurality of lower construction work constituting the construction work, which are produced when the construction works are broken down.
摘要:
A scheduling system and a CAD system are used to prepare a construction plan in plant construction simulation. A construction work managed by the scheduling system and a plant part used in the construction work and managed by the CAD system, are managed in association with each other. When the plant part is broken down into a plurality of lower plant parts constituting the plant part, as a plurality of lower construction works of the construction work, the processing for associating the lower plant parts with the lower construction works is performed. Data for mutually associating the construction works and the plant parts based on the processing is generated. The generated data is used to mutually link the scheduling system and the CAD system, and a situation in which appropriate parts are installed as progress of the construction work, is displayed.
摘要:
An operation simulation system for plant construction, in which operating expense in a construction operation is calculated based on crane type determined by a command input; the expense to construct foundation is calculated based on the foundation placement on which the determined crane is put; the operating expense is calculated based on a period during which an operation is carried out; the expense to temporarily place the installation object is calculated based on the specifications of the installation object before the installation; the installation operation expense is calculated based on an installation milestone reflecting a due date of the installation object; the total necessary expense is calculated based on all the expenses calculated; the total necessary expense is analyzed and evaluated; and the command input is adjusted by reflecting the results of an evaluation analysis so that the value of the command input falls within ranges set in mutually.
摘要:
An operation simulation system for plant construction, having operating expense calculated based on crane type determined by a command input; the expense to construct foundation calculated based on the foundation placement on which the determined crane is put; the operating expense calculated based on a period during which an operation is carried out; the expense to temporarily place the installation object calculated based on the specifications of the installation object before the installation; the installation operation expense calculated based on an installation milestone reflecting a due date of the installation object; the total necessary expense calculated based on all the expenses calculated; the total necessary expense is analyzed and evaluated; and the command input is adjusted by reflecting the results of an evaluation analysis so that the value of the command input falls in range of the set values in the specifications held by the corresponding setting apparatus.
摘要:
A progress status management device and a method for managing a progress status are provided so that a progress status of respective processes in a project is visually and swiftly confirmed. By using the device and method, it is possible to prevent a delay of the project progress because the processing states of processes at an optional stage of the project are shared and easily grasped by managers and workers among departments and outside business partners in charge of the project.
摘要:
A progress status management device and a method for managing a progress status are provided so that a progress status of respective processes in a project is visually and swiftly confirmed. By using the device and method, it is possible to prevent a delay of the project progress because the processing states of processes at an optional stage of the project are shared and easily grasped by managers and workers among departments and outside business partners in charge of the project.
摘要:
A construction progress visualization system, having a scaffolding model creating-unit for creating an area and a form of scaffolding required for a construction operation based on a 3D CAD model and a construction schedule data; a scaffolding schedule extracting-unit for extracting scaffolding schedule data regarding the scaffolding from the construction schedule data; a scaffolding display form determining-unit for determining a completion rate of the scaffolding on a visualization-target date based on a relationship between the visualization-target date and the scaffolding schedule data, and obtaining a display form of the scaffolding; and a display process unit for displaying, concurrently with the CAD model, the scaffolding area based on the obtained display form of the scaffolding.
摘要:
A computer readable storage medium encoded with a project assessment program for assessing a project including a plurality of processes when executed by a computer computing forecasts of the project based on a set of information. At least one scheme by a user input is selected from a group of schemes including an estimation of mutual-correlation of estimated value pattern. Process planning information, up-to-date actual process information and forecast model information of each process included in the project is retrieved. The forecast model information of each process of the project is defined as probability distribution variations of a plurality of parameters of the processes, wherein the probability distribution variations are quantitative values of the project. Estimated values of variations in at least two parameters of the processes using the process planning information, the up-to-date actual process information and the forecast model information are computed.
摘要:
The information processing apparatus for project management comprises: a function of displaying on a screen a task area 12 where a symbol 123 representing a document relating to a task constituting a project is displayed; and a function of performing document work according to an operation instruction for the symbol 125 representing the document displayed in the task area 12. The task area 12 has a work area 121 which displays a symbol 123 representing the document, and an output area 122. When a symbol 126 representing a document is moved within the output area 122, the output area 122 displays a symbol representing the document in a task area of another associated task constituting the project.
摘要:
When the process plan made for execution is corrected based on the process correction condition, the variation amount in each of processes based on the process correction condition is calculated as the probability distribution using the probability distribution data generated by obtaining the probability distribution from the variation-amount prediction value of each of the processes. Thereby, the influence degree on other processes when the process is corrected can be estimated not simply as the propagation of the variation fixed value but so as to be more suited to the actual circumstances in accordance with the attribute information and the past variation patterns of the process.