Method for generating data of plant construction simulation and system thereof
    2.
    发明授权
    Method for generating data of plant construction simulation and system thereof 有权
    用于生成工厂建筑模拟数据的方法及其系统

    公开(公告)号:US08155928B2

    公开(公告)日:2012-04-10

    申请号:US12354236

    申请日:2009-01-15

    IPC分类号: G06F17/50

    摘要: A scheduling system and a CAD system are used to prepare a construction plan in plant construction simulation. A construction work managed by the scheduling system and a plant part used in the construction work and managed by the CAD system, are managed in association with each other. When the plant part is broken down into a plurality of lower plant parts constituting the plant part, as a plurality of lower construction works of the construction work, the processing for associating the lower plant parts with the lower construction works is performed. Data for mutually associating the construction works and the plant parts based on the processing is generated. The generated data is used to mutually link the scheduling system and the CAD system, and a situation in which appropriate parts are installed as progress of the construction work, is displayed.

    摘要翻译: 调度系统和CAD系统用于制定工厂建设模拟中的施工方案。 由调度系统管理的施工工程和由CAD系统管理的施工作业中使用的工厂部件相互联系进行管理。 当将植物部分分解为构成植物部分的多个下部植物部分时,作为施工作业的多个下部施工工程,执行将下部植物部分与下部建筑工程相关联的处理。 产生了基于处理相互联系建筑工程和工厂部件的数据。 生成的数据被用于相互链接调度系统和CAD系统,并且显示在构建工作的进度中安装适当部件的情况。

    OPERATION SIMULATION SYSTEM FOR PLANT CONSTRUCTION
    3.
    发明申请
    OPERATION SIMULATION SYSTEM FOR PLANT CONSTRUCTION 失效
    工厂施工操作模拟系统

    公开(公告)号:US20090192772A1

    公开(公告)日:2009-07-30

    申请号:US12353373

    申请日:2009-01-14

    IPC分类号: G06G7/48

    CPC分类号: G06Q10/06 G06Q50/08

    摘要: An operation simulation system for plant construction, in which operating expense in a construction operation is calculated based on crane type determined by a command input; the expense to construct foundation is calculated based on the foundation placement on which the determined crane is put; the operating expense is calculated based on a period during which an operation is carried out; the expense to temporarily place the installation object is calculated based on the specifications of the installation object before the installation; the installation operation expense is calculated based on an installation milestone reflecting a due date of the installation object; the total necessary expense is calculated based on all the expenses calculated; the total necessary expense is analyzed and evaluated; and the command input is adjusted by reflecting the results of an evaluation analysis so that the value of the command input falls within ranges set in mutually.

    摘要翻译: 一种用于工厂建设的操作模拟系统,其中基于由命令输入确定的起重机类型来计算施工作业中的操作费用; 基于确定的起重机的基础位置计算建造基础的费用; 操作费用是根据进行操作的期间计算的; 暂时放置安装对象的费用是根据安装前的安装对象的规格进行计算的; 安装操作费用根据反映安装对象到期日的安装里程计算; 总费用按计算的所有费用计算; 对总需求费用进行分析评估; 并且通过反映评估分析的结果来调整命令输入,使得命令输入的值落在相互设置的范围内。

    Operation simulation system for plant construction
    4.
    发明授权
    Operation simulation system for plant construction 失效
    工厂建设运行模拟系统

    公开(公告)号:US08095346B2

    公开(公告)日:2012-01-10

    申请号:US12353373

    申请日:2009-01-14

    IPC分类号: G06G7/48

    CPC分类号: G06Q10/06 G06Q50/08

    摘要: An operation simulation system for plant construction, having operating expense calculated based on crane type determined by a command input; the expense to construct foundation calculated based on the foundation placement on which the determined crane is put; the operating expense calculated based on a period during which an operation is carried out; the expense to temporarily place the installation object calculated based on the specifications of the installation object before the installation; the installation operation expense calculated based on an installation milestone reflecting a due date of the installation object; the total necessary expense calculated based on all the expenses calculated; the total necessary expense is analyzed and evaluated; and the command input is adjusted by reflecting the results of an evaluation analysis so that the value of the command input falls in range of the set values in the specifications held by the corresponding setting apparatus.

    摘要翻译: 一种用于工厂建造的操作模拟系统,具有基于由命令输入确定的起重机类型计算的操作费用; 根据确定的起重机的基础位置计算建造基础的费用; 基于进行操作的期间计算的营业费用; 在安装前根据安装对象的规格临时放置安装对象的费用; 安装操作费用根据反映安装对象到期日的安装里程计算; 根据所计算的所有费用计算所需总费用; 对总需求费用进行分析评估; 并且通过反映评估分析的结果来调整命令输入,使得命令输入的值落在由相应的设置装置保持的规格中的设定值的范围内。

    PROGRESS STATUS MANAGEMENT METHOD, PROGRAM, AND PROGRESS STATUS MANAGEMENT DEVICE
    5.
    发明申请
    PROGRESS STATUS MANAGEMENT METHOD, PROGRAM, AND PROGRESS STATUS MANAGEMENT DEVICE 失效
    进展状态管理方法,程序和进展状态管理装置

    公开(公告)号:US20090125352A1

    公开(公告)日:2009-05-14

    申请号:US12267684

    申请日:2008-11-10

    IPC分类号: G06Q10/00

    CPC分类号: G06Q10/063114 G06Q10/06

    摘要: A progress status management device and a method for managing a progress status are provided so that a progress status of respective processes in a project is visually and swiftly confirmed. By using the device and method, it is possible to prevent a delay of the project progress because the processing states of processes at an optional stage of the project are shared and easily grasped by managers and workers among departments and outside business partners in charge of the project.

    摘要翻译: 提供进度状态管理装置和管理进度状态的方法,使得项目中的各个进程的进度状况被视觉上迅速地确认。 通过使用设备和方法,可以防止项目进展的延迟,因为项目任意阶段的流程处理状态由各部门和外部业务合作伙伴之间的管理人员和工作人员共同掌握, 项目。

    Progress status management method, program, and progress status management device
    6.
    发明授权
    Progress status management method, program, and progress status management device 失效
    进度状态管理方法,程序和进度状态管理装置

    公开(公告)号:US08620708B2

    公开(公告)日:2013-12-31

    申请号:US12267684

    申请日:2008-11-10

    IPC分类号: G06Q10/00 G06Q10/06

    CPC分类号: G06Q10/063114 G06Q10/06

    摘要: A progress status management device and a method for managing a progress status are provided so that a progress status of respective processes in a project is visually and swiftly confirmed. By using the device and method, it is possible to prevent a delay of the project progress because the processing states of processes at an optional stage of the project are shared and easily grasped by managers and workers among departments and outside business partners in charge of the project.

    摘要翻译: 提供进度状态管理装置和管理进度状态的方法,使得项目中的各个进程的进度状况被视觉上迅速地确认。 通过使用设备和方法,可以防止项目进展的延迟,因为项目任意阶段的流程处理状态由各部门和外部业务合作伙伴之间的管理人员和工作人员共同掌握, 项目。

    System and method for visualizing the construction progress of scaffolding utilizing 3D CAD models
    7.
    发明授权
    System and method for visualizing the construction progress of scaffolding utilizing 3D CAD models 有权
    使用3D CAD模型可视化脚手架施工进度的系统和方法

    公开(公告)号:US08249909B2

    公开(公告)日:2012-08-21

    申请号:US12607543

    申请日:2009-10-28

    IPC分类号: G06Q10/00

    摘要: A construction progress visualization system, having a scaffolding model creating-unit for creating an area and a form of scaffolding required for a construction operation based on a 3D CAD model and a construction schedule data; a scaffolding schedule extracting-unit for extracting scaffolding schedule data regarding the scaffolding from the construction schedule data; a scaffolding display form determining-unit for determining a completion rate of the scaffolding on a visualization-target date based on a relationship between the visualization-target date and the scaffolding schedule data, and obtaining a display form of the scaffolding; and a display process unit for displaying, concurrently with the CAD model, the scaffolding area based on the obtained display form of the scaffolding.

    摘要翻译: 一种施工进度可视化系统,具有用于创建基于3D CAD模型和施工进度数据的施工操作所需的区域和脚手架形式的脚手架模型创建单元; 一种用于从施工进度数据提取关于脚手架的脚手架计划数据的脚手架计划提取单元; 脚手架显示形式确定单元,用于基于所述可视化目标日期和所述脚手架计划数据之间的关系,确定所述脚手架在可视化目标日期的完成率,以及获取所述脚手架的显示形式; 以及显示处理单元,用于基于获得的脚手架的显示形式与CAD模型同时显示脚手架区域。

    Project assessment system and method
    8.
    发明授权
    Project assessment system and method 失效
    项目评估制度和方法

    公开(公告)号:US07729932B2

    公开(公告)日:2010-06-01

    申请号:US10685839

    申请日:2003-10-14

    IPC分类号: G06F17/30

    摘要: A computer readable storage medium encoded with a project assessment program for assessing a project including a plurality of processes when executed by a computer computing forecasts of the project based on a set of information. At least one scheme by a user input is selected from a group of schemes including an estimation of mutual-correlation of estimated value pattern. Process planning information, up-to-date actual process information and forecast model information of each process included in the project is retrieved. The forecast model information of each process of the project is defined as probability distribution variations of a plurality of parameters of the processes, wherein the probability distribution variations are quantitative values of the project. Estimated values of variations in at least two parameters of the processes using the process planning information, the up-to-date actual process information and the forecast model information are computed.

    摘要翻译: 一种用项目评估程序编码的计算机可读存储介质,所述项目评估程序用于当基于一组信息由计算机计算项目的预测来执行时评估包括多个处理的项目。 从包括估计值图案的相互关系的估计的方案组中选择用户输入的至少一个方案。 检索过程计划信息,包含在项目中的每个过程的最新实际过程信息和预测模型信息。 项目每个过程的预测模型信息被定义为过程的多个参数的概率分布变化,其中概率分布变化是项目的定量值。 计算使用过程规划信息的过程的至少两个参数的变化的估计值,最新的实际过程信息和预测模型信息。