Wellbore Method and Apparatus for Completion, Production and Injection
    2.
    发明申请
    Wellbore Method and Apparatus for Completion, Production and Injection 有权
    井眼完井,生产和注射的方法和装置

    公开(公告)号:US20100032158A1

    公开(公告)日:2010-02-11

    申请号:US12086577

    申请日:2006-12-15

    IPC分类号: E21B43/04

    CPC分类号: E21B43/04 E21B33/127

    摘要: A method, system and apparatus associated with the production of hydrocarbons are described. The method includes disposing a plurality of sand control devices having a primary flow path and a secondary flowpath within a wellbore adjacent to a subsurface reservoir. A packer having primary and secondary flow paths is then coupled between two of the sand control devices such that the primary and secondary flow paths of the packer are in fluid flow communication with the primary and secondary flowpaths of the sand control devices. The packer is then set within an interval, which may be an open-hole section of the wellbore. With the packer set, gravel packing of the sand control devices in different intervals may be performed. The interval above the packer may be packed before the interval below the packer. A treatment fluid may then be injected into the wellbore via the secondary flow paths of the packer and sand control devices. Then, hydrocarbons are produced from the wellbore by passing hydrocarbons through the sand control devices with the different intervals providing zonal isolation.

    摘要翻译: 描述了与烃的生产相关的方法,系统和装置。 该方法包括在邻近地下储层的井筒内设置多个具有主流路和次流径的防砂装置。 具有主要和次要流动路径的封隔器然后被联接在两个防砂装置之间,使得封隔器的主要和次要流动路径与沙子控制装置的主要和次要流动路径流体连通。 封隔器然后设置在间隔内,其可以是井眼的露天部分。 使用封隔器,可以执行不同间隔的砂控制装置的砾石包装。 封隔器上方的间隔可以在封隔器之前的间隔之前包装。 然后可以通过封隔器和防砂控制装置的二次流动路径将处理流体注入井眼。 然后,通过使烃通过防砂装置以不同的间隔提供区带隔离从井筒产生烃。

    Wellbore Method and Apparatus for Completion, Production and Injection
    3.
    发明申请
    Wellbore Method and Apparatus for Completion, Production and Injection 有权
    井眼完井,生产和注射的方法和装置

    公开(公告)号:US20090294128A1

    公开(公告)日:2009-12-03

    申请号:US12086572

    申请日:2006-12-15

    IPC分类号: E21B43/16 E21B33/122

    CPC分类号: E21B43/04 E21B33/127

    摘要: A method, system and apparatus associated with the production of hydrocarbons are described. One apparatus includes a swellable packer element around a primary and a secondary flow path, wherein the packer is configured to block flow in a portion of a wellbore annulus. One method includes disposing sand control devices having shunt tubes and a packer within a wellbore adjacent to a subsurface reservoir. The packer is then set within an interval, which may be an open-hole section of the wellbore. With the packer set, gravel packing of the sand control devices in different intervals may be performed. Then, hydrocarbons are produced from the wellbore by passing hydrocarbons through the sand control devices with the different intervals providing zonal isolation. In some embodiments, intervals may be alternatively packed and plugged, wherein the plugged intervals are not packed. In addition, the method may also include disposing the sand control devices and packer into the wellbore in conditioned drilling fluid. The conditioned drilling fluid may be displaced adjacent to the sand control devices by a carrier fluid. Again, once the packer is set, the gravel packing the intervals with the carrier fluid having gravel may be performed.

    摘要翻译: 描述了与烃的生产相关的方法,系统和装置。 一种装置包括围绕初级和次级流动路径的可膨胀的封隔器元件,其中所述封隔器构造成阻挡在井筒环的一部分中的流动。 一种方法包括将具有分流管和封隔器的防砂装置设置在邻近地下储层的井筒内。 封隔器然后设置在间隔内,其可以是井眼的露天部分。 使用封隔器,可以执行不同间隔的砂控制装置的砾石包装。 然后,通过使烃通过防砂装置以不同的间隔提供区带隔离从井筒产生烃。 在一些实施例中,间隔可以替代地包装和堵塞,其中堵塞的间隔不被包装。 此外,该方法还可以包括将调砂装置和封隔器设置在调节钻井液中的井眼中。 调节钻井液可以通过载体流体邻近防砂装置移动。 再次,一旦封隔器被固定,则可以执行与具有砾石的载体流体间隔填充的砾石。

    Wellbore Method and Apparatus For Completion, Production and Injection
    4.
    发明申请
    Wellbore Method and Apparatus For Completion, Production and Injection 有权
    井眼方法和装置完成,生产和注射

    公开(公告)号:US20120234555A1

    公开(公告)日:2012-09-20

    申请号:US13485571

    申请日:2012-05-31

    IPC分类号: E21B33/122 E21B43/00

    CPC分类号: E21B43/04 E21B33/127

    摘要: Method, system and apparatus to produce hydrocarbons includes a packer apparatus with a swellable packer element around primary and secondary flow paths, the packer is configured to block flow in a portion of a wellbore annulus. The method includes disposing sand control devices having shunt tubes and a packer within a wellbore adjacent to a subsurface reservoir. The packer is then set within an interval, which may be an open-hole section of the wellbore, and gravel packing the sand control devices in different intervals. Hydrocarbons are produced by passing hydrocarbons through the sand control devices with different intervals providing zonal isolation. In some embodiments, intervals may be alternatively packed and plugged, wherein the plugged intervals are not packed.

    摘要翻译: 用于生产碳氢化合物的方法,系统和设备包括具有围绕主要和次要流动路径的可膨胀封隔器元件的封隔器装置,封隔器构造成阻挡在井筒环的一部分中的流动。 该方法包括将具有分流管和封隔器的防砂装置设置在邻近地下储层的井筒内。 然后将封隔器设置在间隔内,其可以是井眼的露天部分,并且以不同的间隔将砂控制装置砾石包装。 碳氢化合物是通过使不同间隔的碳氢化合物通过防砂装置产生的,可提供区域隔离。 在一些实施例中,间隔可以替代地包装和堵塞,其中堵塞的间隔不被包装。

    Wellbore method and apparatus for completion, production and injection
    5.
    发明授权
    Wellbore method and apparatus for completion, production and injection 有权
    Wellbore方法和装置完成,生产和注入

    公开(公告)号:US08215406B2

    公开(公告)日:2012-07-10

    申请号:US12086572

    申请日:2006-12-15

    IPC分类号: E21B47/04

    CPC分类号: E21B43/04 E21B33/127

    摘要: A method, system and apparatus associated with the production of hydrocarbons are described. One apparatus includes a swellable packer element around a primary and a secondary flow path, wherein the packer is configured to block flow in a portion of a wellbore annulus. One method includes disposing sand control devices having shunt tubes and a packer within a wellbore adjacent to a subsurface reservoir. The packer is then set within an interval, which may be an open-hole section of the wellbore. With the packer set, gravel packing of the sand control devices in different intervals may be performed. Then, hydrocarbons are produced from the wellbore by passing hydrocarbons through the sand control devices with the different intervals providing zonal isolation. In some embodiments, intervals may be alternatively packed and plugged, wherein the plugged intervals are not packed. In addition, the method may also include disposing the sand control devices and packer into the wellbore in conditioned drilling fluid. The conditioned drilling fluid may be displaced adjacent to the sand control devices by a carrier fluid. Again, once the packer is set, the gravel packing the intervals with the carrier fluid having gravel may be performed.

    摘要翻译: 描述了与烃的生产相关的方法,系统和装置。 一种装置包括围绕初级和次级流动路径的可膨胀的封隔器元件,其中所述封隔器构造成阻挡在井筒环的一部分中的流动。 一种方法包括将具有分流管和封隔器的防砂装置设置在邻近地下储层的井筒内。 封隔器然后设置在间隔内,其可以是井眼的露天部分。 使用封隔器,可以执行不同间隔的砂控制装置的砾石包装。 然后,通过使烃通过防砂装置以不同的间隔提供区带隔离从井筒产生烃。 在一些实施例中,间隔可以替代地包装和堵塞,其中堵塞的间隔不被包装。 此外,该方法还可以包括将调砂装置和封隔器设置在调节钻井液中的井眼中。 调节钻井液可以通过载体流体邻近防砂装置移动。 再次,一旦封隔器被固定,则可以执行与具有砾石的载体流体间隔填充的砾石。

    Wellbore method and apparatus for completion, production and injection
    6.
    发明授权
    Wellbore method and apparatus for completion, production and injection 有权
    Wellbore方法和装置完成,生产和注入

    公开(公告)号:US08517098B2

    公开(公告)日:2013-08-27

    申请号:US12086577

    申请日:2006-12-15

    IPC分类号: E21B43/04 E21B43/08

    CPC分类号: E21B43/04 E21B33/127

    摘要: A method, system and apparatus associated with the production of hydrocarbons are described. The method includes disposing a plurality of sand control devices having a primary flow path and a secondary flowpath within a wellbore adjacent to a subsurface reservoir. A packer having primary and secondary flow paths is then coupled between two of the sand control devices such that the primary and secondary flow paths of the packer are in fluid flow communication with the primary and secondary flowpaths of the sand control devices. The packer is then set within an interval, which may be an open-hole section of the wellbore. With the packer set, gravel packing of the sand control devices in different intervals may be performed. The interval above the packer may be packed before the interval below the packer. A treatment fluid may then be injected into the wellbore via the secondary flow paths of the packer and sand control devices. Then, hydrocarbons are produced from the wellbore by passing hydrocarbons through the sand control devices with the different intervals providing zonal isolation.

    摘要翻译: 描述了与烃的生产相关的方法,系统和装置。 该方法包括在邻近地下储层的井筒内设置多个具有主流路和次流径的防砂装置。 具有主要和次要流动路径的封隔器然后被联接在两个防砂装置之间,使得封隔器的主要和次要流动路径与沙子控制装置的主要和次要流动路径流体连通。 封隔器然后设置在间隔内,其可以是井眼的露天部分。 使用封隔器,可以执行不同间隔的砂控制装置的砾石包装。 封隔器上方的间隔可以在封隔器之前的间隔之前包装。 然后可以通过封隔器和防砂控制装置的二次流动路径将处理流体注入井眼。 然后,通过使烃通过防砂装置以不同的间隔提供区带隔离从井筒产生烃。

    Wellbore method and apparatus for completion, production and injection
    7.
    发明授权
    Wellbore method and apparatus for completion, production and injection 有权
    Wellbore方法和装置完成,生产和注入

    公开(公告)号:US08403062B2

    公开(公告)日:2013-03-26

    申请号:US13485571

    申请日:2012-05-31

    IPC分类号: E21B47/04

    CPC分类号: E21B43/04 E21B33/127

    摘要: Method, system and apparatus to produce hydrocarbons includes a packer apparatus with a swellable packer element around primary and secondary flow paths, the packer is configured to block flow in a portion of a wellbore annulus. The method includes disposing sand control devices having shunt tubes and a packer within a wellbore adjacent to a subsurface reservoir. The packer is then set within an interval, which may be an open-hole section of the wellbore, and gravel packing the sand control devices in different intervals. Hydrocarbons are produced by passing hydrocarbons through the sand control devices with different intervals providing zonal isolation. In some embodiments, intervals may be alternatively packed and plugged, wherein the plugged intervals are not packed.

    摘要翻译: 用于生产碳氢化合物的方法,系统和设备包括具有围绕主要和次要流动路径的可膨胀封隔器元件的封隔器装置,封隔器构造成阻挡在井筒环的一部分中的流动。 该方法包括将具有分流管和封隔器的防砂装置设置在邻近地下储层的井筒内。 然后将封隔器设置在间隔内,其可以是井眼的露天部分,并且以不同的间隔将砂控制装置砾石包装。 碳氢化合物是通过使不同间隔的碳氢化合物通过防砂装置产生的,可提供区域隔离。 在一些实施例中,间隔可以替代地包装和堵塞,其中堵塞的间隔不被包装。

    Wellbore method and apparatus for sand and inflow control during well operations
    9.
    发明授权
    Wellbore method and apparatus for sand and inflow control during well operations 有权
    井眼操作中砂井和流入控制的井筒方法和装置

    公开(公告)号:US08127831B2

    公开(公告)日:2012-03-06

    申请号:US13049512

    申请日:2011-03-16

    IPC分类号: E21B43/08

    CPC分类号: E21B43/04 E21B33/12 E21B43/08

    摘要: Method and apparatus for producing hydrocarbons including a wellbore that accesses a subsurface reservoir; a production tubing string disposed within the wellbore; and sand control devices coupled to the production tubing string. At least one of the sand control devices includes a first tubular member having a permeable section and a non permeable section; a second tubular member disposed within the first tubular member. The second tubular member has a plurality of openings and an inflow control device that provides a flow path to the interior. The sand control devices include a sealing mechanism disposed between the first tubular member and the second tubular member to provide pressure loss during gravel packing operations that is less than the pressure loss during production operations.

    摘要翻译: 用于生产碳氢化合物的方法和装置,包括进入地下储层的井眼; 设置在井眼内的生产油管柱; 以及连接到生产油管柱的砂控制装置。 至少一个防砂装置包括具有可渗透部分和不可渗透部分的第一管状部件; 设置在第一管状构件内的第二管状构件。 第二管状构件具有多个开口和流入控制装置,其向内部提供流动路径。 砂控制装置包括设置在第一管状构件和第二管状构件之间的密封机构,以在砾石填充操作期间提供小于生产操作期间的压力损失的压力损失。