-
公开(公告)号:US20240303398A1
公开(公告)日:2024-09-12
申请号:US18261306
申请日:2022-01-17
Applicant: Schlumberger Technology Corporation
Inventor: Tao Shen , Jia Xu Liu , Florian Le Blay , Samba Ba , Xin Chen
CPC classification number: G06F30/27 , E21B21/08 , E21B47/04 , E21B2200/20
Abstract: A method and a processing device are provided for predicting standpipe pressure. A Bayesian linear regressor is initialized. Priors for the Bayesian linear regressor are initialized based on previous drilling operations that used a same bottom hole assembly. Measurement data associated with drilling a well is received in real time. An online Bayesian linear regressor update is generated using QR decomposition for a model. Responsive to determining that at least some coefficients violate physical rules, the at least some of the coefficients are set to a respective default value that is either zero or a positive value. Coefficients and uncertainty are updated based on at least one of the online Bayesian linear regressor update and the setting of at least some of the coefficients. The model is then visualized. Visualization helps a user identify whether the learned model makes sense.
-
公开(公告)号:US20170030184A1
公开(公告)日:2017-02-02
申请号:US15220269
申请日:2016-07-26
Applicant: SCHLUMBERGER TECHNOLOGY CORPORATION
Inventor: Samba Ba , Anton Kolyshkin
Abstract: A method for determining a remaining life span of an elastomer in a motor. The method includes running a downhole tool into a wellbore. The downhole tool includes a mud motor having a rotor and a stator. At least one of the rotor or the stator includes, or is at least partially made from, an elastomer. A number of cycles before the elastomer fails may be predicted. A number of cycles during a time period may be determined. A change in a remaining life span of the elastomer over the time period may be determined, based upon the number of cycles before the elastomer fails and the number of cycles during the time period.
Abstract translation: 一种用于确定电动机中弹性体的剩余寿命的方法。 该方法包括将井下工具运行到井筒中。 井下工具包括具有转子和定子的泥浆马达。 转子或定子中的至少一个包括或至少部分地由弹性体制成。 可以预测在弹性体失效之前的多个循环。 可以确定在一段时间段内的多个周期。 弹性体在该时间段内的剩余寿命的变化可以基于弹性体失效前的循环次数和该时间段内的循环次数来确定。
-
公开(公告)号:US20250129702A1
公开(公告)日:2025-04-24
申请号:US18910191
申请日:2024-10-09
Applicant: Schlumberger Technology Corporation
Inventor: Samba Ba , Juan Carlos Fernandez
IPC: E21B44/00 , E21B7/06 , E21B47/024 , E21B47/04
Abstract: A method for steering a downhole tool to drill a wellbore in a subterranean formation includes receiving an initial wellbore plan for the downhole tool to drill through the subterranean formation. The method also includes receiving drilling data while the downhole tool is drilling through the subterranean formation using the initial wellbore plan. The method also includes comparing the initial wellbore plan to the drilling data. The method also includes determining a downlink command to transmit to the downhole tool based upon or in response to the comparison. The method also includes determining an importance of the downlink command based upon the comparison. The method also includes determining a time to transmit the downlink command to the downhole tool. The time is determined based upon the importance of the downlink command. The method also includes transmitting the downlink command to the downhole tool at the determined time.
-
公开(公告)号:US20240183263A1
公开(公告)日:2024-06-06
申请号:US18436244
申请日:2024-02-08
Applicant: Schlumberger Technology Corporation
Inventor: Samba Ba , Lu Jiang , Adrien Chassard , Magnus Hedlund , Maja Ignova , Katharine Mantle , Jinsoo Kim , Tao Yu , Farid Toghi , Hendrik Suryadi , Qing Liu , Diego Medina
IPC: E21B44/00 , E21B7/06 , E21B47/022
CPC classification number: E21B44/00 , E21B7/068 , E21B47/022 , E21B2200/20
Abstract: A system and method that include receiving a well plan and determining a plurality of sections of the well plan and receiving data from surface and downhole to determine a current location of a drill bit. The system and method also include analyzing the well plan to automatically derive trajectory constraints that are associated with each of the plurality of sections of the well plan and determining a plurality of trajectory candidates that pertain to respective paths from the current location of the drill bit to respective targets based on a consideration of the trajectory constraints. The system and method further include determining costs according to at least one cost function to rank the plurality of trajectory candidates to determine a working plan that includes an optimal path from the current location of the drill bit to reach a final target.
-
公开(公告)号:US11808131B2
公开(公告)日:2023-11-07
申请号:US17812204
申请日:2022-07-13
Applicant: Schlumberger Technology Corporation
Inventor: Samba Ba , Conie Chiock , Ginger Hildebrand , Maurice Ringer
IPC: E21B44/00 , E21B7/04 , E21B47/024 , E21B41/00 , E21B49/00
CPC classification number: E21B44/00 , E21B7/04 , E21B41/00 , E21B47/024 , E21B49/00 , E21B15/04 , E21B41/00
Abstract: A computer-implemented method including receiving a steering command identifying a tool face orientation in which the steering command is expected to produce an intended steering response of an intended drilling trajectory. The method further includes receiving an actual steering response result of the steering command in which the actual steering response result identifies an actual drilling trajectory. The method further includes storing a dataset comparing the actual steering response result in relation to the intended steering response, determining an uncertainty level of the tool face orientation based on the stored dataset, and outputting a visual representation of steering response with the uncertainty level.
-
公开(公告)号:US20220290550A1
公开(公告)日:2022-09-15
申请号:US17653404
申请日:2022-03-03
Applicant: Schlumberger Technology Corporation
Inventor: Samba Ba , Lu Jiang , Adrien Chassard , Magnus Hedlund , Maja Ignova , Katharine Mantle , Jinsoo Kim , Tao Yu , Farid Toghi , Hendrik Suryadi , Qing Liu , Diego Medina
IPC: E21B44/00 , E21B7/06 , E21B47/022
Abstract: A method can include receiving data for a bottom hole assembly of a drillstring and a drill plan; generating candidate trajectories using at least a portion of the data; generating drill command schedules for the candidate trajectories; ranking the candidate trajectories based at least in part on the drill command schedules; and outputting at least a top ranked candidate trajectory and its corresponding drill command schedule.
-
公开(公告)号:US10975680B2
公开(公告)日:2021-04-13
申请号:US15569047
申请日:2016-04-28
Applicant: Schlumberger Technology Corporation
Inventor: Benjamin Peter Jeffryes , Samba Ba
Abstract: A system and method for operating a mud motor in a wellbore. The method includes running the mud motor into the wellbore. A threshold rate of a pressure increase over time is selected. A rate of a pressure increase over time is measured across the mud motor in the wellbore. A flow rate of a fluid being pumped into the wellbore is varied when the measured rate is greater than or equal to the threshold rate.
-
公开(公告)号:US20210079778A1
公开(公告)日:2021-03-18
申请号:US16569576
申请日:2019-09-12
Applicant: Schlumberger Technology Corporation
Inventor: Samba Ba , Conie Chiock , Ginger Hildebrand , Maurice Ringer
IPC: E21B44/00 , E21B7/04 , E21B47/024 , E21B41/00
Abstract: A computer-implemented method including receiving a steering command identifying a tool face orientation in which the steering command is expected to produce an intended steering response of an intended drilling trajectory. The method further includes receiving an actual steering response result of the steering command in which the actual steering response result identifies an actual drilling trajectory. The method further includes storing a dataset comparing the actual steering response result in relation to the intended steering response, determining an uncertainty level of the tool face orientation based on the stored dataset, and outputting a visual representation of steering response with the uncertainty level.
-
公开(公告)号:US20190316895A1
公开(公告)日:2019-10-17
申请号:US16383285
申请日:2019-04-12
Applicant: Schlumberger Technology Corporation
Inventor: Samba Ba , Maxim Pushkarev , Anton Kolyshkin
Abstract: A method, system, and computer-readable medium related to control of mud motors in drilling systems, of which the method includes measuring an eccentricity of rotation of a rotor in a stator of a mud motor using a rotor-position sensor, determining a torque of the mud motor based in part on the eccentricity, and selecting a fluid flow rate, a pressure, or both of fluid delivered downhole, through the mud motor, based in part on the determined torque.
-
公开(公告)号:US20250129709A1
公开(公告)日:2025-04-24
申请号:US18489895
申请日:2023-10-19
Applicant: Schlumberger Technology Corporation
Inventor: Samba Ba , Hai Feng Li , Prateek Goel , Lu Jiang , Yang Yuan , Chong Wei Wan , Ying Fei Hu , Jinsoo Kim , Peng Jin
IPC: E21B47/022
Abstract: A method of preventing a collision of a subject wellbore in a downhole environment includes receiving offset wellbore data corresponding with one or more offset wellbores and identifying, based on the offset wellbore data, one or more no-go zones for each of the one or more offset wellbores. The method further includes determining a plurality of safe points corresponding with a potential intersection of the subject wellbore with the one or more no-go zones and, defining an escape zone within the plurality of safe points. The method further includes determining a trajectory for the subject wellbore within the escape zone.
-
-
-
-
-
-
-
-
-