WELDING SYSTEM, WELDING PROCESS, AND WELDED ARTICLE
    2.
    发明申请
    WELDING SYSTEM, WELDING PROCESS, AND WELDED ARTICLE 审中-公开
    焊接系统,焊接工艺和焊接工艺

    公开(公告)号:US20130136940A1

    公开(公告)日:2013-05-30

    申请号:US13304969

    申请日:2011-11-28

    IPC分类号: B23K26/00 B32B9/04 B23K9/16

    摘要: A welding system, welding process and welded article are disclosed. The system includes a laser welding apparatus, a GMAW apparatus, and a GTAW apparatus. The laser welding apparatus, the GMAW apparatus, and the GTAW apparatus are positioned to weld an article along a weld path. The process includes providing a welding system having a laser welding apparatus, a GMAW apparatus, and a GTAW apparatus. The process further includes welding an article with one or more of the laser welding apparatus, the GMAW apparatus, and the GTAW apparatus. The welded article includes a weld formed by welding from a GMAW apparatus, a laser welding apparatus, and a GTAW apparatus.

    摘要翻译: 公开了焊接系统,焊接工艺和焊接制品。 该系统包括激光焊接装置,GMAW装置和GTAW装置。 激光焊接装置,GMAW装置和GTAW装置被定位成沿着焊接路径焊接物品。 该方法包括提供具有激光焊接装置,GMAW装置和GTAW装置的焊接系统。 该方法还包括用一个或多个激光焊接装置,GMAW装置和GTAW装置焊接物品。 焊接制品包括由GMAW装置,激光焊接装置和GTAW装置焊接形成的焊接。

    CLADDING SYSTEM AND METHOD FOR APPLYING A CLADDING TO A POWER GENERATION SYSTEM COMPONENT
    5.
    发明申请
    CLADDING SYSTEM AND METHOD FOR APPLYING A CLADDING TO A POWER GENERATION SYSTEM COMPONENT 有权
    用于将发电系统组件应用于封闭系统和方法

    公开(公告)号:US20130032577A1

    公开(公告)日:2013-02-07

    申请号:US13197905

    申请日:2011-08-04

    IPC分类号: B23K9/04 B23K9/00

    CPC分类号: B23K9/042 B23K9/1735

    摘要: A cladding system and method for applying a cladding to a power generation system component including a first weld bead, a second weld and a filler bead. The first weld is deposited on the surface with a first energy source and solidified to form a first weld bead. The second weld is deposited on the surface adjacent to the first weld bead with the first energy source, wherein depositing the second weld creates a surface depression between the first weld bead and second weld. The filler bead is simultaneously deposited in the surface depression with a second energy source while depositing the second weld bead. The second weld and the filler bead are solidified to form the cladding bead.

    摘要翻译: 一种用于将包层施加到包括第一焊道,第二焊缝和填料焊道的发电系统部件的包层系统和方法。 第一焊缝用第一能量源沉积在表面上并固化以形成第一焊道。 第二焊缝通过第一能量源沉积在与第一焊道相邻的表面上,其中沉积第二焊缝在第一焊道和第二焊缝之间形成表面凹陷。 在沉积第二焊道的同时,用第二能源同时将填料珠沉积在表面凹陷中。 第二焊缝和填料珠被固化以形成包覆珠。