-
公开(公告)号:US11187006B2
公开(公告)日:2021-11-30
申请号:US16137488
申请日:2018-09-20
申请人: Alan Qing-Lin Zhu
发明人: Alan Qing-Lin Zhu
摘要: A fence accessory includes at least two ornament bodies, each of the at least two ornament bodies including a first connecting part and a second connecting part at two opposing ends thereof. The first connecting part of one of the at least two ornament bodies and the second connecting part of an other one of the at least two ornament bodies are configured to be connected to a fence bar and clamped together as one unit. Moreover, each of the first connecting part and the second connecting part includes a hook and a slot at two opposing sides of the first connecting part and the second connecting part. The hook of the first connecting part of one ornament body is configured to connect to the slot of the second connecting part of an adjacent accessory body.
-
公开(公告)号:US20210047943A1
公开(公告)日:2021-02-18
申请号:US17074583
申请日:2020-10-19
申请人: Lin Zhu
IPC分类号: F01K7/16
摘要: An air energy power machine comprises an air compressor (1). An air inlet end of the air compressor is connected with an air storage tank (2) through a pipeline; an air outlet end of the air compressor is connected with a first heat exchanger (3) through a pipeline; a second heat exchanger (4) is connected to the right side of the first heat exchanger through a pipeline; the second heat exchanger is connected with the air storage tank to form a closed loop; a first liquid pump (5) connected with the first heat exchanger through a pipeline is arranged below the first heat exchanger; a first liquid collection tank (6) is connected to the first liquid pump; a first steam turbine (7) is arranged above the first heat exchanger; a steam inlet of the first steam turbine is connected with the first heat exchanger through a pipeline.
-
公开(公告)号:USD1030192S1
公开(公告)日:2024-06-11
申请号:US29858013
申请日:2022-10-27
申请人: Lin Zhu
设计人: Lin Zhu
摘要: FIG. 1 is a front, right and top perspective view of a sports bra, showing my design.
FIG. 2 is a rear, left and bottom perspective view thereof.
FIG. 3 is a front elevation view thereof.
FIG. 4 is a rear elevation view thereof.
FIG. 5 is a left side elevation view thereof.
FIG. 6 is a right side elevation view thereof.
FIG. 7 is a top plan view thereof; and,
FIG. 8 is a bottom plan view thereof.-
公开(公告)号:US20200300147A1
公开(公告)日:2020-09-24
申请号:US16899675
申请日:2020-06-12
申请人: Lin ZHU
发明人: Zhenzhen ZHU , Lin ZHU
摘要: An internal combustion engine waste heat utilization system comprises a cooling medium, a cooling medium storage tank (9), a cooling medium delivery pipe (8), a circulation pump (7), a high-pressure pipeline (15), energy storage tanks (14, 12), steam turbines (13,11) and a radiator (10). The cooling medium forms high-temperature and high-pressure gas by absorbing waste heat of an internal combustion engine and exhaust gas, so as to drive the steam turbines to do work and convert thermal energy into kinetic energy.
-
公开(公告)号:US11066974B2
公开(公告)日:2021-07-20
申请号:US16899675
申请日:2020-06-12
申请人: Lin Zhu
发明人: Zhenzhen Zhu , Lin Zhu
摘要: An internal combustion engine waste heat utilization system comprises a cooling medium, a cooling medium storage tank (9), a cooling medium delivery pipe (8), a circulation pump (7), a high-pressure pipeline (15), energy storage tanks (14, 12), steam turbines (13,11) and a radiator (10). The cooling medium forms high-temperature and high-pressure gas by absorbing waste heat of an internal combustion engine and exhaust gas, so as to drive the steam turbines to do work and convert thermal energy into kinetic energy.
-
公开(公告)号:US11203951B2
公开(公告)日:2021-12-21
申请号:US17074583
申请日:2020-10-19
申请人: Lin Zhu
IPC分类号: F01K7/16
摘要: An air energy power machine comprises an air compressor (1). An air inlet end of the air compressor is connected with an air storage tank (2) through a pipeline; an air outlet end of the air compressor is connected with a first heat exchanger (3) through a pipeline; a second heat exchanger (4) is connected to the right side of the first heat exchanger through a pipeline; the second heat exchanger is connected with the air storage tank to form a closed loop; a first liquid pump (5) connected with the first heat exchanger through a pipeline is arranged below the first heat exchanger; a first liquid collection tank (6) is connected to the first liquid pump; a first steam turbine (7) is arranged above the first heat exchanger; a steam inlet of the first steam turbine is connected with the first heat exchanger through a pipeline.
-
-
-
-
-