Abstract:
This disclosure relates to an adjustable paving machine. In some examples, the adjustable paving machine includes a variably expandable portion. The variably expandable portion may be expandable laterally such as to accommodate paving operations of variable widths. The adjustable paving machine may be configured to spread a variety of paving materials on a paving surface, including oils, emulsions, asphalt, slurries, or the like. The adjustable paving machine may include a containment basin operative to contain a paving material such as to reduce lateral or longitudinal movement of the paving material. The adjustable paving machine may include an adjustable shoe configured to move the paving machine vertically relative to the paving surface. The adjustable paving machine may include one or more spreading elements configured to spread the paving material on the paving surface. The spreading elements may be supported by a spreading element support enabling easy replacement of the spreading elements.
Abstract:
A strike off assembly for a placer spreader apparatus includes a strike off support beam and left and right side plate assemblies attached to ends of the support beam. A strike off plate assembly includes a left strike off plate portion and a right strike off plate portion pivotably connected together. A plurality of strike off actuators are connected to the strike off plate assembly and configured to raise and lower the strike off plate assembly relative to the support beam to vary a height of a material placement space.
Abstract:
The present invention relates to an asphalt composition for road pavement, which is excellent in drying strength, strength after immersion in water, and bending strength, a method for producing the same, and a road paving method. [1] An asphalt composition for road pavement including asphalt, a polyester resin and an aggregate, wherein the polyester resin is a specific polyester, and the ratio of the polyester resin is 2 parts by mass or more and 30 parts by mass or less based on 100 parts by mass of asphalt; [2] a method for producing an asphalt composition for road pavement, including a step of mixing asphalt, a polyester resin, and an aggregate at 130° C. or higher and 200° C. or lower, wherein the polyester resin is the polyester in [1], and the ratio of the polyester resin is 2 parts by mass or more and 30 parts by mass or less based on 100 parts by mass of asphalt; and [3] a road paving method including a step of laying the asphalt composition obtained by the method of [2], thereby forming an asphalt paving material layer.
Abstract:
Surface-formation equipment includes a blade including a beam; and an attachment structure having a proximal end connected to the blade and a distal end configured to be attached to a mobile unit. The surface-formation equipment may also include a blade including a beam; and at least one lateral wing pivot-connected to one end of the main section, the at least one lateral wing being able to be configured in an unfolded configuration and at least one folded position. The surface-formation equipment may include a cutting edge secured to the beam near the lower surface.
Abstract:
An asphalt mix tracking system having a data collection system adapted to determine at least one characteristic of the asphalt mix, a data control system adapted to receive data from the data collection system, a lot tracking system adapted to track a lot of the asphalt mix, a truck tracking system adapted to track a truck, and a pavement injection system adapted to identify the lot of the asphalt mix. The preferred asphalt mix tracking system is adapted to substantially continuously track the asphalt mix from a mixing site to a paving site. A method for tracking an asphalt mix including determining the at least one characteristic of the asphalt mix, communicating the at least one characteristic of the asphalt mix to the data control system, transporting the asphalt mix from the mixing site to the paving site, and injecting an identification means at the paving site.
Abstract:
A track-supporting roller assembly, according to the disclosure, for supporting a crawler track of a crawler chassis includes a bearing unit and a track-supporting roller rotatably coupled to the bearing unit. The track-supporting roller includes at least one supporting body made of plastic. The supporting body serves as a damper and prevents a metal-on-metal contact between track chain links of the crawler track and the track-supporting roller. The track-supporting roller assembly according to the disclosure ensures a reduced noise development in the crawler chassis. At the same time, it is possible to also reduce the wear of the track-supporting rollers to a considerable extent.
Abstract:
A mechanized asphalt comb device and method of mechanized asphalt raking that can integrate infrared heating elements to seamlessly repair asphalt deterioration.
Abstract:
A method of operating machine system includes receiving expected material placement data for a paving machine and comparing the expected material placement data with actual material placement data. The method further includes outputting a signal based on the comparison, and commanding replenishing material from a supply machine to the second supply volume responsive to the signal. A paving control system for a paving system includes a computer readable memory configured to store expected material placement data, a receiver configured to receive actual material placement data and a data processor configured to output a control signal to a supply machine to controllably replenish material to an external material supply volume for the paving system in a manner responsive to comparing the expected material placement data with the actual material replacement data.
Abstract:
A system and method for building and renovating golf course paths to provide an alternate golf cart path with a drainage system and durable natural path for golf. A drainage system and a layer of gravel is installed over the entire sub grade of the path. A layer of crumb rubber is placed over the gravel. A pre-polymer is sprayed onto the layer of crumb rubber and gravel to secure it in place. The polymer sprayed is permitted to cure for approximately 24-48 hours.
Abstract:
The present invention describes a road finisher for laying a paving material, comprising a material bunker for paving material and a spray jet module. In order to increase the spray carrying capacity in a structurally simple manner, it is suggested that a reservoir unit comprising a spray reservoir and a paving material reservoir should be arranged in the material bunker.