Secant concrete shoring using helical piles for depth

    公开(公告)号:US11613864B2

    公开(公告)日:2023-03-28

    申请号:US17237544

    申请日:2021-04-22

    IPC分类号: E02D5/34 E02D5/52 E02D5/56

    摘要: A pile shoring wall includes tangent concrete piles that are formed in the ground at an excavation site. The tangent concrete piles include a plurality of a first type of concrete piles in the ground at depths wherein the average depth is d1 and a plurality of a second type of concrete piles. The second type of concrete piles includes 10% and less than 50% of the tangent concrete piles, and each have a shaft of a helical pile secured therewithin. Each helical pile has a bottom portion with helical flights for screwing the helical pile into the ground, and each helical pile is set into the ground to a depth of at least about 2 m below d1. The helical flights of each helical pile are exposed to the surrounding soil and increase resistance below an excavation depth when the site is excavated.

    Construction Method of Fast-setting Polymer Grouting for Rapid Control of Slope Erosion and Landslide

    公开(公告)号:US20230009242A1

    公开(公告)日:2023-01-12

    申请号:US17811841

    申请日:2022-07-11

    摘要: A construction method of fast-setting polymer grouting for rapid control of slope erosion and landslide. This solution includes a landslide control method and a slope erosion control method: sorting out an operation platform; drilling and grouting of polymer high-pressure jet grouting piles on the diseased slope; drilling a row of grouting water interception holes densely on the rear edge of the diseased slope; drilling, on the operation platform, a plurality of anchor holes on the diseased slope; inserting a ground anchor into each anchor hole and performing polymer grouting to form a polymer anchorage body; laying a steel wire gauze on the surface of the diseased slope, and connecting and fixing the steel wire gauze with the tail end of each ground anchor; spraying a two-component expandable polymer grouting material onto the steel wire gauze to form a polymer anti-scour layer; drilling a plurality of planting holes on the diseased slope with a backpack drill through meshes of the steel wire gauze; and filling each planting hole with grass seed mixed nutrient soil. The present invention has the advantages of short construction period, ecological and environmental protection, convenient construction, high strength and strong scour resistance.

    System for and method of stabilizing rail track structures using a load transfer apparatus

    公开(公告)号:US11512435B2

    公开(公告)日:2022-11-29

    申请号:US16706915

    申请日:2019-12-09

    发明人: David J. White

    摘要: A system for and method of stabilizing rail track structures using a load transfer apparatus is disclosed. The load transfer apparatus includes a vertical load transfer element and a top load transfer element, wherein the top load transfer element is used to transfer applied locomotive and rail car loads to the vertical load transfer element. In one embodiment, the top load transfer element includes helical flights. In another embodiment, the top load transfer element includes a flared top. In yet another embodiment, the top load transfer element includes a load transfer cap. In a further embodiment, the top load transfer element includes two or more support legs each with a top support attached thereto. The railroad stabilization system can comprise any one type or any combinations of types of the aforementioned load transfer apparatuses.

    PILE POURING STRUCTURE BASED ON INFORMATIZATION TECHNOLOGY AND PILE STRUCTURE

    公开(公告)号:US20220307217A1

    公开(公告)日:2022-09-29

    申请号:US17594797

    申请日:2021-03-18

    IPC分类号: E02D5/34

    摘要: A pile pouring structure includes a steel reinforcement cage, a limiting ring arranged on the outer side of the steel reinforcement cage, a plurality of PVC pipes arranged in the steel reinforcement cage, a cut-off layer arranged on the limiting ring, a two-dimensional code display board arranged in one-to-one correspondence with the steel reinforcement cage, the cut-off layer is annular. The two-dimensional code display board is provided with a two-dimensional code which is scanned to enter an information input interface. Information management is achieved in the pile construction process by scanning the two-dimensional code for inputting pile body strength information, thereby improving the work efficiency. The cut-off layer is used as an interface between a pile body and a pile head so that a part needing to be broken is rapidly positioned. The pile head at a part above the cut-off layer is broken so that the cut-off layer is capable of protecting a lower structure.

    Auger grouted displacement pile
    8.
    发明授权

    公开(公告)号:US11001981B2

    公开(公告)日:2021-05-11

    申请号:US16664218

    申请日:2019-10-25

    摘要: A method and apparatus place an auger grouted displacement pile or helical pile in soil. The pile has an elongated shaft with at least one lateral compaction protrusion which establishes a regular circumference in the supporting medium. The pile also has a helical blade configured to move the pile into the supporting medium. The bottom of the shaft includes means for forming irregularities in the circumference after compaction by the lateral compaction protrusion. The bore is filled with grout while leaving the pile in the soil.

    AUGER GROUTED DISPLACEMENT PILE
    9.
    发明申请

    公开(公告)号:US20200165789A1

    公开(公告)日:2020-05-28

    申请号:US16664226

    申请日:2019-10-25

    摘要: A method and apparatus place an auger grouted displacement pile or helical pile in soil. The pile has an elongated shaft with at least one lateral compaction protrusion which establishes a regular circumference in the supporting medium. The pile also has a helical blade configured to move the pile into the supporting medium. The bottom of the shaft includes means for forming irregularities in the circumference after compaction by the lateral compaction protrusion. The bore is filled with grout while leaving the pile in the soil.