摘要: A double wire lip hook is provided. The double wire lip hook may be used for electrical power line work by helicopter or crane, in which closely spaced pairs of wires are used. The double wire lip hook may also be used for single wires and other lifting and pulling tasks. The example double wire lip hook has a geometry designed for high strength, maintaining a substantial cross-sectional area of metal or alloy throughout its profile. The double wire lip hook provides dual opposing hooks with wide throats cambered for wires. Dual tapers in a vertical shank member provide a large gape opening for each hook and keep loads on either side close to the vertical lifting axis for improved stability. Features such as one or more support ribs add to lifting strength and resistance to yield failure.
-
2.
公开(公告)号:US20230228364A1
公开(公告)日:2023-07-20
申请号:US18186975
申请日:2023-03-21
发明人: Zehua SHAO , Bin LIU , Lei ZHANG , Yong LI , Yongzeng LIANG
CPC分类号: F16L59/21 , F16L1/00 , G01F15/043 , F16L51/00
摘要: The embodiments of the present disclosure provide methods and Internet of Things systems for installing a gas pipeline compensator of smart gas. The method may be implemented by a processor of a smart gas device management platform of an Internet of Things system for installing a gas pipeline compensator of smart gas and may include: obtaining a pipeline feature and an estimated operation feature of a target pipeline; generating an estimated stretching and contracting feature of the target pipeline based on the pipeline feature and the estimated operation feature; and generating an installation parameter of the compensator based on the estimated stretching and contracting feature, wherein the installation parameter at least includes a device parameter of the compensator.
-
公开(公告)号:US10604281B2
公开(公告)日:2020-03-31
申请号:US15280280
申请日:2016-09-29
申请人: U.S.A. as represented by the Administrator of the National Aeronautics and Space Administration
发明人: Hans Raven , Matthew Ashmore , Erich Schulze
摘要: A Cooperative Service Valve includes a fitting connected to a valve body via a tube, a stem configured to fit within the valve body. The stem includes a stem first end having a first seal and configured to movably fit within a tube first end, a sealing portion connected to the stem first end and configured, in a first position, to provide a second seal between the sealing portion and an inner surface of the stem body, a fluid flow portion comprising openings for allowing liquid or gaseous media to pass through the Cooperative Service Valve when the stem is in a second position and a stem second end configured to secure a poppet guide, a poppet and a spring associated with the poppet that biases the poppet against a seal to yield a third seal. The first, second and third seals open and close in a particular order to allow or prevent fluid from flowing through the stem.
-
公开(公告)号:US10228056B2
公开(公告)日:2019-03-12
申请号:US15823829
申请日:2017-11-28
发明人: Roy L. Dean
摘要: A seal has a seal body with an axis and axial-facing surfaces. The seal body is configured to be mounted to a tubular member, and seal between the tubular member and a second tubular member. A visual indicium can be located on only one of the axial-facing surfaces. Prior to assembly of the tubular member and the second tubular member, the visual indicium is configured to be visible to a user after being correctly mounted to the tubular member without the user physically contacting the seal body.
-
公开(公告)号:US20180202578A1
公开(公告)日:2018-07-19
申请号:US15922487
申请日:2018-03-15
申请人: Borehead, LLC
发明人: David A. ZIOLA , Aaron FAKEN , Jason LAVALLEY , Jesse KILDE
IPC分类号: F16L1/00 , F16L1/032 , F16L3/10 , F16L101/50 , F16L55/30
CPC分类号: F16L1/00 , F16L1/032 , F16L3/1066 , F16L3/1091 , F16L55/1152 , F16L55/30 , F16L2101/50
摘要: A pipe pulling technique where an adaptor is attached to the end of the pipe prior to the pipe being pulled underground, for example through a drilled hole. Attaching the adaptor to the pipe end prior to the pipe being pulled underground is faster and reduces danger to workers compared to the conventional process of attaching the adaptor to the end of the pipe after the pipe has been pulled underground.
-
6.
公开(公告)号:US20180142809A1
公开(公告)日:2018-05-24
申请号:US15360167
申请日:2016-11-23
CPC分类号: F02C7/32
摘要: A method for ensuring the correct orientation of tubing in a gas turbine engine. The method including prefabricating a first alignment bend in a first tube, prefabricating a second alignment bend in a second tube, aligning the first alignment bend in the same plane as the second alignment bend to place the first tube and the second tube in the correct orientation during installation, and connecting the first tube and the second tube.
-
公开(公告)号:US09869331B2
公开(公告)日:2018-01-16
申请号:US14823349
申请日:2015-08-11
IPC分类号: F16L1/11 , F16B2/08 , F16B1/00 , F16L1/00 , F16B17/00 , G01V15/00 , F16L57/00 , G09F3/16 , G09F19/22
CPC分类号: F16B2/08 , F16B1/0071 , F16B17/00 , F16L1/00 , F16L1/11 , F16L57/00 , G01V15/00 , G09F3/16 , G09F19/22 , G09F19/228 , H02G9/025
摘要: A universal fastener is provided. The universal fastener is connectable to a buryable element such as a pipe. A marker may be removably attached to the fastener to extend away from the buryable element allowing it to be easily identified once buried.
-
公开(公告)号:US09631742B2
公开(公告)日:2017-04-25
申请号:US14770710
申请日:2014-03-21
申请人: ITREC B.V.
摘要: A marine pipeline installation vessel for laying a pipeline on the seabed, the vessel at least being adapted to carry out the reel lay method, wherein the vessel includes at least a first and a second storage reel for storage of the pipeline to be laid, which storage reels are positioned in or onto the vessel; a pipeline launch tower mounted to the vessel, which pipeline launch tower is adapted to launch the pipeline in a firing line along said tower; a pipeline guide which is mounted at an elevated position to the pipeline launch tower, which pipeline guide has a pipeline guide surface member providing an essentially circular or semi-circular pipeline guide surface, which pipeline guide is adapted to—in a primary pipelaying position thereof relative to the tower guide a pipeline from a first storage reel over the pipeline guide into the firing line, wherein the pipeline contacts the pipeline guide surface at a first contact point fore of the firing line and departs the surface at a first departure point into the firing line.
-
公开(公告)号:US09441772B2
公开(公告)日:2016-09-13
申请号:US13787222
申请日:2013-03-06
申请人: UPSCO, Inc.
CPC分类号: F16L21/06 , E21B17/10 , E21B17/105 , F16L1/028 , F16L7/00 , F16L21/065 , F16L57/06
摘要: A borehole pipe protection apparatus includes a sheet of material having an inner surface and an outer surface and a longitudinal direction and a width direction defined by two edges of the sheet along the longitudinal direction. A fastening structure is configured to join the two edges to form a seam as the sheet of material is wrapped in the width direction around a pipe that is configured to be installed into the borehole to form a sock along the longitudinal direction. The sock is configured to be installed in the borehole with the pipe about which it is wrapped, yet to remain for a service life in non-bonding contact with the pipe. A method for protecting pipe during and after insertion into a borehole is also described.
摘要翻译: 钻孔管保护装置包括具有内表面和外表面以及沿着纵向由片材的两个边缘限定的纵向方向和宽度方向的材料片。 紧固结构被构造成连接两个边缘以形成接缝,因为该材料片沿着构造成安装到钻孔中的管的宽度方向包裹以沿纵向方向形成袜子。 该袜子被配置成安装在钻孔中,其上缠绕有管子,而保持与管道非接触接触的使用寿命。 还描述了在插入井眼期间和之后保护管道的方法。
-
公开(公告)号:US09203226B2
公开(公告)日:2015-12-01
申请号:US13796391
申请日:2013-03-12
发明人: Daniel Paul Miller
摘要: Methods and apparatus for cutting a trench (e.g., for a fiber optic cable or wire conductors) in an existing covering surface (e.g., a road surface), wherein the trench has a depth of approximately 10 to 12 inches and a width of approximately 0.5 to 1.25 inches. Debris from the cut trench is evacuated (e.g., vacuumed) from the trench as the trench is cut. The trench may be backfilled by flowing a non-shrinking composition into at least a portion of the trench and, after hardening of the non-shrinking composition, applying a topping material to a remaining portion of the trench. In one example, the non-shrinking composition is configured to rigidify within one hour of being flowed into the trench, be substantially impermeable thereafter (e.g., having a hydraulic permeability of less than 0.0000001 cm/s upon drying), and be non-compressible and non-expanding.