发明公开
EP3073012A1 RAILWAY MAINTENANCE MACHINE FOR TRACK LEVELLING AND ALIGNMENT WITH THE CAPACITY TO OPERATE WITHOUT INTERRUPTIONS IN ITS ADVANCE ON STRAIGHT TRACKS AND TO OPERATE ON TRACK TURNOUTS TAMPING THE DIVERGING TRACK 审中-公开
铁路维护机跟踪矫直和方向操作能力不间断地驾驶中在直道上与运行跟踪与软堵塞分支曲目结束

  • 专利标题: RAILWAY MAINTENANCE MACHINE FOR TRACK LEVELLING AND ALIGNMENT WITH THE CAPACITY TO OPERATE WITHOUT INTERRUPTIONS IN ITS ADVANCE ON STRAIGHT TRACKS AND TO OPERATE ON TRACK TURNOUTS TAMPING THE DIVERGING TRACK
  • 专利标题(中): 铁路维护机跟踪矫直和方向操作能力不间断地驾驶中在直道上与运行跟踪与软堵塞分支曲目结束
  • 申请号: EP16382116.8
    申请日: 2016-03-15
  • 公开(公告)号: EP3073012A1
    公开(公告)日: 2016-09-28
  • 发明人: Ibañez Latorre, Jose Antonio
  • 申请人: Ibañez Latorre, Jose Antonio
  • 申请人地址: Paradisia 25 28230 Las Rozas (Madrid) ES
  • 专利权人: Ibañez Latorre, Jose Antonio
  • 当前专利权人: Ibañez Latorre, Jose Antonio
  • 当前专利权人地址: Paradisia 25 28230 Las Rozas (Madrid) ES
  • 代理机构: Isern-Jara, Nuria
  • 优先权: ES201530363 20150318
  • 主分类号: E01B27/17
  • IPC分类号: E01B27/17
RAILWAY MAINTENANCE MACHINE FOR TRACK LEVELLING AND ALIGNMENT WITH THE CAPACITY TO OPERATE WITHOUT INTERRUPTIONS IN ITS ADVANCE ON STRAIGHT TRACKS AND TO OPERATE ON TRACK TURNOUTS TAMPING THE DIVERGING TRACK
摘要:
Railway maintenance machine for track levelling and alignment, with the capacity to operate without interruptions to its advance on straight tracks, to operate on track turnouts, and with the capacity to tamp the diverging track, characterised in that it comprises a lifting and slewing unit with a duplicated power system at the front end and at the rear end of said unit, where the lifting and slewing unit comprises a lifting trolley (21), with two pairs of hydraulic cylinders (27A and 27B) arranged so as to exert force to lift the track, and a slewing trolley (20) with two pairs of hydraulic cylinders (28A and 28B), arranged so as to exert force to modify the lateral position of the track, where said power system at the front end exerts force to carry out approximately 80% of the levelling and alignment needed by the track and where said power system at the rear end exerts force to carry out the rest of the levelling and alignment needed by the track to reach its definitive position.
信息查询
0/0