Data driven scheduler on multiple computing cores
Abstract:
Methods, devices, and systems for data driven scheduling of a plurality of computing cores of a processor. A plurality of threads may be executed on the plurality of computing cores, according to a default schedule. The plurality of threads may be analyzed, based on the execution, to determine correlations among the plurality of threads. A data driven schedule may be generated based on the correlations. The plurality of threads may be executed on the plurality of computing cores according to the data driven schedule.
Public/Granted literature
Information query
Patent Agency Ranking
0/0