Invention Grant
- Patent Title: Structure for monitoring stability of existing subgrade/slope and construction method thereof
-
Application No.: US16074647Application Date: 2017-09-29
-
Publication No.: US10684112B2Publication Date: 2020-06-16
- Inventor: Xinzhuang Cui , Weidong Cao , Lei Zhang , Junwei Su , Yilin Wang , Jun Li , Sheqiang Cui , Zhongxiao Wang
- Applicant: SHANDONG UNIVERSITY
- Applicant Address: CN Shandong
- Assignee: SHANDONG UNIVERSITY
- Current Assignee: SHANDONG UNIVERSITY
- Current Assignee Address: CN Shandong
- Agency: Oliff PLC
- Priority: com.zzzhc.datahub.patent.etl.us.BibliographicData$PriorityClaim@325c6850
- International Application: PCT/CN2017/104484 WO 20170929
- International Announcement: WO2019/056410 WO 20190328
- Main IPC: G01B7/16
- IPC: G01B7/16 ; E02D17/20 ; G01N33/24

Abstract:
The structure has a subgrade or slope to be monitored and strip-shaped smart geosynthetic material compound devices. The strip-shaped smart geosynthetic material compound devices are buried to run through a subgrade or slope predicted slip crack surface. Gaps between the strip-shaped smart geosynthetic material compound devices and borehole inner walls are filled so that the force environment of the strip-shaped smart geosynthetic material compound devices is close to the subgrade or slope internal environment. Each strip-shaped smart geosynthetic material compound device has a strip-shaped geogrid, lead, and heat shrinkable tube. The lead is arranged in a length direction of the geogrid, and the lead and geogrid are fixedly connected at an interval of a set distance, with each fixed point forming a measuring point. The geogrid is wrapped in the heat shrinkable tube, and a free end of the lead is drawn out of the heat shrinkable tube.
Public/Granted literature
- US20190178623A1 STRUCTURE FOR MONITORING STABILITY OF EXISTING SUBGRADE/SLOPE AND CONSTRUCTION METHOD THEREOF Public/Granted day:2019-06-13
Information query