- 专利标题: Method for pre-stressing a steel structure, and steel structure pre-stressed using said method
-
申请号: US16874643申请日: 2020-05-14
-
公开(公告)号: US11326313B2公开(公告)日: 2022-05-10
- 发明人: Masoud Motavalli , Elyas Ghafoori
- 申请人: S&P CLEVER REINFORCEMENT COMPANY AG
- 申请人地址: CH Seewen
- 专利权人: S&P CLEVER REINFORCEMENT COMPANY AG
- 当前专利权人: S&P CLEVER REINFORCEMENT COMPANY AG
- 当前专利权人地址: CH Seewen
- 代理机构: CUSPA Technology Law Associates, P.A.
- 代理商 Yi Li
- 优先权: CHCH950/2013 20130514
- 主分类号: E01D22/00
- IPC分类号: E01D22/00 ; E04C3/10 ; E04C5/08 ; E01D6/00 ; E04B1/24 ; E04G23/02 ; E01D101/32
摘要:
According to the method, at least one carbon fibre-reinforced polymer band is joined to the steel structure at the end regions thereof, capable of transferring tensile forces. Subsequently, at least one lifting element (7) disposed between the carbon fibre-reinforced polymer band (4) and the steel girder (3) to be reinforced in a region between these end anchorages (5), is extended substantially perpendicular to the carbon fibre-reinforced polymer band (4). So, a tensile force stress is generated between the end regions of the carbon fibre-reinforced polymer band (4). Then, a steel girder treated in such a manner includes at least one carbon fibre-reinforced polymer band, which is each joined to the steel structure (1) at the end regions thereof, capable of transferring tensile forces. In the region between these end regions, a lifting element (7) is disposed between the carbon fibre-reinforced polymer band (4) and the steel girder (3) to be reinforced, by means of which the carbon fibre-reinforced polymer band (4) is subjected to tensile stress by lifting away from the steel girder (3). The tensile force is transferred to the steel girder (3) via the anchoring elements (5).
公开/授权文献
信息查询