Invention Grant
- Patent Title: Device for simulating full-scale pile-sinking process of static pressure pile by air bag preloading and test method thereof
-
Application No.: US17846945Application Date: 2022-06-22
-
Publication No.: US11486804B1Publication Date: 2022-11-01
- Inventor: Yonghong Wang , Mingyi Zhang , Jun Wang , Bo Han , Jiangbin Wu , Chuantong Zhang , Xiang Fang , Yishun Jiang , Yuning Ge , Qijun Zhang , Weihui Tian , Yan Li , Xun Zhu , Baochang Zhang , Guodong Shao
- Applicant: QINGDAO UNIVERSITY OF TECHNOLOGY , Qingdao Green Technology Geotechnical Engineering Co., Ltd. , China State Construction Zhongxin Construction Engineering Co., Ltd. Shandong Branch , Shandong Luqiao Group Co., Ltd., Jinan, China , Zhongji Jiurui Geotechnical Engineering Co., Ltd.
- Applicant Address: CN Qingdao; CN Qingdao; CN Qingdao; CN Jinan; CN Qingdao
- Assignee: QINGDAO UNIVERSITY OF TECHNOLOGY,Qingdao Green Technology Geotechnical Engineering Co., Ltd.,China State Construction Zhongxin Construction Engineering Co., Ltd. Shandong Branch,Shandong Luqiao Group Co., Ltd., Jinan, China,Zhongji Jiurui Geotechnical Engineering Co., Ltd.
- Current Assignee: QINGDAO UNIVERSITY OF TECHNOLOGY,Qingdao Green Technology Geotechnical Engineering Co., Ltd.,China State Construction Zhongxin Construction Engineering Co., Ltd. Shandong Branch,Shandong Luqiao Group Co., Ltd., Jinan, China,Zhongji Jiurui Geotechnical Engineering Co., Ltd.
- Current Assignee Address: CN Qingdao; CN Qingdao; CN Qingdao; CN Jinan; CN Qingdao
- Priority: CN202210479564.2 20220505
- Main IPC: G01N3/12
- IPC: G01N3/12 ; E02B17/02

Abstract:
Provided are a device for simulating a full-scale pile-sinking process of a static pressure pile by air bag preloading and a test method thereof. The device comprises a frame, a beam, a hydraulic jack, a model box, a model pile, a first sand layer, an undisturbed soil mass, a second sand layer, a rubber pad, a forcing air bag, a counter-force steel plate, a model box top cover, a forcing pipe, a pressure relief pipe, a steel casing and a control system. The first sand layer, the undisturbed soil mass, the second sand layer, the rubber pad, the forcing air bag and the counter-force steel plate are laid in the model box in sequence; and the steel casing passes through the model box top cover, the counter-force steel plate, the forcing air bag and the rubber pad in sequence and then reaches a bottom portion of the second sand layer.
Information query