Method for installing a hollow concrete tower made from more than one segment and corresponding hollow concrete tower
摘要:
Method for installing a hollow concrete tower comprising the following steps: a) arranging a platform on a site; b) arranging on said platform at least one partial full-segment mould in a position such that the segment axis of the segment being cast in said mould is substantially vertical; c) pouring concrete inside said arranged partial mould(s); d) allowing the poured concrete to set to working strength, generating corresponding segment(s); e) removing the arranged mould(s) with concrete set to working strength, to leave the corresponding segment(s) exposed; f) assembling said corresponding exposed segment(s); and g) optionally, repeating steps b)-f) at least once.
信息查询
0/0