METHOD FOR ASSEMBLING A NACELLE OF A WIND TURBINE AND LIFT ARRANGEMENT FOR SAME

    公开(公告)号:US20250059953A1

    公开(公告)日:2025-02-20

    申请号:US18724323

    申请日:2022-12-01

    Abstract: A method of handling an auxiliary nacelle unit (24, 26) of a wind turbine (10) includes assembling a temporary hoist (52) on a main nacelle unit (22) by pivotally connecting a boom (64) to the main nacelle unit (22), pivotally connecting a mast (66) to the main nacelle unit (22), connecting the actuator (68) between the mast (66) and the boom (64), and routing a hoist cable (56) from a winch (54) to a hoist cable locator (60). The method further includes connecting the hoist cable (56) to an auxiliary nacelle unit (24, 26), activating the winch (54) to move the auxiliary nacelle unit (24, 26) from a first position to a second position, and activating the actuator (68) to move the boom (64) between the retracted position and the extend position. A lifting arrangement (50) for handling an auxiliary nacelle unit (24, 26) of a wind turbine (10) is also disclosed.

    METHOD OF MOUNTING A WIND TURBINE ROTOR BLADE

    公开(公告)号:US20250059951A1

    公开(公告)日:2025-02-20

    申请号:US18701497

    申请日:2022-09-30

    Abstract: A method of mounting a wind turbine rotor blade to a partial assembly is provided, the partial assembly including a number of rotor blades mounted to a hub which in turn is connected to a rotor shaft of a wind turbine, the method including the steps of A) effecting a rotation of the rotor shaft to turn the partial assembly from its starting position through an initial arc (β0); B1) allowing the partial assembly to swing through a free swing arc in the opposite direction; B2) effecting a rotation of the rotor shaft to extend the free swing arc (α) by a further arc (β); and C) repeating steps B1 and B2 until the partial assembly has reached a final position at an angular displacement of 120° to the initial position.

    A NACELLE INSTALLATION METHOD AT A WIND TURBINE

    公开(公告)号:US20250035087A1

    公开(公告)日:2025-01-30

    申请号:US18710890

    申请日:2022-10-31

    Abstract: Wind turbine installation method the installation method including: providing a nacelle (2) at a wind turbine erection site, said nacelle (2) comprising: a main unit (20), arranged to be connected to the wind turbine tower (3), and configured for housing a rotor-supporting assembly of the wind-turbine: at least one auxiliary unit (21, 22) housing an operative component (34) forming part of the power conversion assembly, wherein: the main unit (20) and the auxiliary unit (21, 22) are separate units configured to be connected by a unit fixation structure at an interface, and wherein the operative component (34) is supportable directly on the main unit (20), said method further including: receiving a said main unit (20) and an auxiliary unit (21, 22) and an operative component (34) to said site of erection of the wind turbine, attaching to said main unit (20) the said auxiliary unit (21, 22) and said operative component (34). and attaching a lifting yoke (50) to the main unit (20) and hoisting the main unit (20) together with the auxiliary unit (21, 22) by means of a crane attached to the lifting yoke (50), wherein the auxiliary unit (21, 22) is supported and lifted by the main unit (20) during the hoisting, and installing the main unit (20) and the attached auxiliary unit (21, 22) at the tower top.

    BLADE INSTALLATION TO AN OFFSHORE WIND TURBINE

    公开(公告)号:US20250020105A1

    公开(公告)日:2025-01-16

    申请号:US18696387

    申请日:2022-09-26

    Abstract: Method for installing a wind turbine blade to a nacelle of an offshore wind turbine, comprising the steps of: providing a vessel or barge with wind turbine blades and a blade installer unit comprising a blade receiving cart; at the offshore wind turbine, bringing a boom of the blade installer unit towards a wind turbine tower of the wind turbine; actuating a tower gripping device unit until the tower gripping device unit engages the tower; inserting a blade into the blade receiving cart, wherein the blade is in approximately horizontal position in the cart; moving the blade receiving cart up towards the upper end of the boom of the blade installer unit; rotating the blade until the blade is in approximately vertical position; moving the blade with respect to the cart until the blade engages the nacelle for coupling to the nacelle.

    WIND TURBINE TOWER WITH CRANE CONNECTION ELEMENTS AND A CRANE WITH TOWER FLANGE CONNECTION ELEMENTS

    公开(公告)号:US20240418151A1

    公开(公告)日:2024-12-19

    申请号:US18821565

    申请日:2024-08-30

    Applicant: LIFTRA IP APS

    Inventor: Per Eske FENGER

    Abstract: A crane comprising a base portion, two arms displaceably connected to the base portion and a lifting boom displaceably connected to the base portion, said lifting boom being provided with a lifting wire and a lifting member, for example a lifting hook, for lifting a load, wherein the two arms and the base portion in combination comprise at least three tower flange connection elements arranged to be detachably connectable to cooperating crane connection elements on a flange of a wind turbine tower section, wherein each arm comprises one of the tower flange connection elements, and wherein the vertical distance between any two tower flange connection elements in the normal operating position of the crane is less than 1 m, less than 50 cm or less than 25 cm. In this way a crane is provided which can be attached to a flange located at the upper portion of a tower section.

    FLOATING FOUNDATION FOR WIND TURBINE GENERATORS

    公开(公告)号:US20240410337A1

    公开(公告)日:2024-12-12

    申请号:US18699402

    申请日:2022-10-07

    Abstract: The invention relates to a floating foundation for wind turbine generators and a method for installing a wind turbine generator on top of and performing maintenance on said foundation. The floating foundation includes a tower and two support legs pivotally connected to the tower, forming a tripod-like structure. The floating foundation may include hydrodynamic damping elements and a single point mooring system leaving the foundation free to weathervane. The invention also relates to a method for using the structure as a crane, lowering and raising the turbine platform against and from e.g. a service barge during maintenance or assembly.

    Device and Method for Offshore Arranging of a Wind Turbine or Components Thereof

    公开(公告)号:US20240376862A1

    公开(公告)日:2024-11-14

    申请号:US18291994

    申请日:2022-07-26

    Abstract: Described is a device for offshore arranging of a wind turbine or components thereof on a foundation present at sea. The device includes an elongate superstructure connected releasably to the foundation and extending between a lower surface and an upper surface thereof in the vertical direction from the foundation. The superstructure has an internal space which is accessible to a tower section of the wind turbine and in which the tower section can be received. Further present is a horizontally displaceable supply structure for a tower section. The supply structure is configured to move a tower section coupled thereto from outside the internal space into the internal space by a horizontal displacement. An engaging structure, received for vertical displacement in the internal space, is configured to lift an engaged tower section in the internal space by a vertical displacement, whereby sufficient space is created under the relevant tower section for receiving another, underlying tower section in the internal space.

Patent Agency Ranking