Control system, switch system, power converter, method for controlling bidirectional switch element, and program
Abstract:
A control system includes a control unit. When turning a bidirectional switch element ON, the control unit controls the bidirectional switch element to cause a time lag between a first timing and a second timing. The first timing is a timing when a voltage equal to or higher than a threshold voltage is applied to one gate electrode selected from a first gate electrode and a second gate electrode. The one gate electrode is associated with one source electrode selected from a first source electrode and a second source electrode and having a lower potential than the other source electrode. The second timing is a timing when a voltage equal to or higher than a threshold voltage is applied to the other gate electrode associated with the other source electrode having a higher potential than the one source electrode.
Information query
Patent Agency Ranking
0/0