Invention Grant
- Patent Title: Sensor network for optimized maintenance schedule
-
Application No.: US16699023Application Date: 2019-11-28
-
Publication No.: US11651627B2Publication Date: 2023-05-16
- Inventor: Amit Vaid , Neha Tomar , Utkarsh Milind Desai , Vijayalakshmi Krishnamurthy , Goldee Udani
- Applicant: Oracle International Corporation
- Applicant Address: US CA Redwood Shores
- Assignee: Oracle International Corporation
- Current Assignee: Oracle International Corporation
- Current Assignee Address: US CA Redwood Shores
- Agency: Potomac Law Group, PLLC
- Main IPC: G07C5/00
- IPC: G07C5/00 ; G05B23/02 ; G06Q10/0635 ; G06Q10/20 ; G07C5/08

Abstract:
Embodiments determine an optimized maintenance schedule for a maintenance program that includes multiple levels, each level including at least one asset (i.e., asset type) and at least one of the levels including a plurality of assets. Embodiments receive historical failure data for each of the assets, the historical failure data generated at least in part by a sensor network. For each asset, embodiments generate a probability density function (“PDF”) using kernel density estimation (“KDE”). For each asset, based on a reliability rate threshold, embodiments determine a cumulative density function (“CDF”) using the PDF. For each asset, embodiments determine an optimized time to failure (“TTF”) using the CDF. Embodiments then create the schedule for each level that includes a minimum TTF for the assets at each level.
Public/Granted literature
- US20210166499A1 SENSOR NETWORK FOR OPTIMIZED MAINTENANCE SCHEDULE Public/Granted day:2021-06-03
Information query