- 专利标题: Scheduling multiple work projects with a shared resource
-
申请号: US17484029申请日: 2021-09-24
-
公开(公告)号: US11948107B2公开(公告)日: 2024-04-02
- 发明人: Krishan Kumar Meghani , Gona Uday Kumar , Kiran Kumar Bodla , Tanna Rahul Udaya Kiran , Kalyan Madhavaram , Jyotirmoy Verma
- 申请人: Hexagon Technology Center GmbH
- 申请人地址: CH Heerbrugg
- 专利权人: Hexagon Technology Center GmbH
- 当前专利权人: Hexagon Technology Center GmbH
- 当前专利权人地址: CH Heerbrugg
- 代理机构: Nutter McClennen & Fish LLP
- 主分类号: G06Q10/06
- IPC分类号: G06Q10/06 ; G06N3/08 ; G06Q10/0631
摘要:
A system for generating task schedules using an electronic device includes: a processor, the processor comprising neural networks; a memory coupled to the processor; a scheduler coupled to the processor, the scheduler is configured to: receive: a total work database configured to contain items representing work packages; a resources database configured to contain items representing resources required to fulfill items in the work packages; a constraints database configured to contain items representing constraints to fulfilling items in the work packages; and a scheduling objective database configured to designate a prime objective that is to be achieved by the optimum task schedule; provide a trained reinforcement learning engine for optimizing the task schedule based on inputs from the databases; and generate an optimum work package schedule to sequence the work packages using the trained reinforcement learning engine, wherein the optimum work package schedule maximizes the one or more prime objectives.
公开/授权文献
- US20230095600A1 SCHEDULING MULTIPLE WORK PROJECTS WITH A SHARED RESOURCE 公开/授权日:2023-03-30
信息查询