发明申请
- 专利标题: Method of Mechanized Construction for Earth Wire Under-Bracing and Extendable Excavating Unit for Auger Crane
- 专利标题(中): 用于螺旋起重机的地线支撑和可扩展挖掘机械结构的方法
-
申请号: US11990514申请日: 2006-10-10
-
公开(公告)号: US20090260891A1公开(公告)日: 2009-10-22
- 发明人: Sae Won Kwon , Dong Hwi Shin , Dong Hwan Park
- 申请人: Sae Won Kwon , Dong Hwi Shin , Dong Hwan Park
- 优先权: KR10-2005-0126562 20051221; KR20-2005-0035857 20051221; KR20-2006-0006631 20060313
- 国际申请: PCT/KR2006/004063 WO 20061010
- 主分类号: E21B10/44
- IPC分类号: E21B10/44 ; E04B1/00
摘要:
A method of mechanized construction has developed for installing an earth wire under-bracing by using an auger crane and adjustable excavating unit with an auger crane. The extendable excavating unit is mounted to the lower end of an auger shaft of the auger crane and excavation teeth extendable and retractable are mounted to the excavating unit, thereby allowing excavation of a burial hole suitable to the size of the earth wire under-bracing. Whether it is needed to bury the earth wire under-bracing having a larger diameter than the diameter of excavation existing on the auger crane, or bury small-sized earth wire under-bracing, a method for mechanized construction of the earth wire under-bracing is enabled without difficulty by using an auger crane and adjustable excavating unit.
公开/授权文献
信息查询