发明申请
US20140130499A1 STEAM TURBINE INSTALLATION AND METHOD FOR OPERATING THE STEAM TURBINE INSTALLATION
有权
蒸汽涡轮机的安装和运行蒸汽涡轮机安装的方法
- 专利标题: STEAM TURBINE INSTALLATION AND METHOD FOR OPERATING THE STEAM TURBINE INSTALLATION
- 专利标题(中): 蒸汽涡轮机的安装和运行蒸汽涡轮机安装的方法
-
申请号: US14131499申请日: 2012-06-14
-
公开(公告)号: US20140130499A1公开(公告)日: 2014-05-15
- 发明人: Carsten Graeber , Thomas Loeper , Michael Wechsung
- 申请人: Carsten Graeber , Thomas Loeper , Michael Wechsung
- 申请人地址: DE Munich
- 专利权人: SIEMENS AKTIENGESELLSCHAFT
- 当前专利权人: SIEMENS AKTIENGESELLSCHAFT
- 当前专利权人地址: DE Munich
- 优先权: EP11174006.4 20110714
- 国际申请: PCT/EP2012/061251 WO 20120614
- 主分类号: F01K7/44
- IPC分类号: F01K7/44 ; F01K13/02 ; F01K7/34 ; F22D1/32
摘要:
A steam turbine installation that has a steam turbine, a steam generator and a feed water pre-heating unit operated by process steam is provided. The steam turbine has an overload bypass line with which main steam can be fed to the feed water pre-heating unit between the steam turbine input and the extraction point during overload operation of the steam turbine, wherein the feed water pre-heating unit has an auxiliary extraction line that is connected to the overload bypass line in such a way that process steam can be extracted from the steam turbine during partial load operation of the steam turbine and added to the feed water pre-heating unit for the additional pre-heating of feed water.
公开/授权文献
信息查询
IPC分类: