MEASUREMENT GAP AND SCHEDULING
摘要:
Aspects are provided which allow a UE to trigger initiation of an SR procedure in response to a decrease in an amount of received data or uplink grants following a measurement gap. The UE receives data from a first base station. The UE performs a measurement of a downlink signal from a second base station based on a measurement configuration. The UE transmits a scheduling request in response to a decrease in at least one of an amount of received downlink data or a number of received grants to transmit uplink data after the measurement is performed. As a result, inefficient data stalls caused by erroneous DRX determinations by a base station may be avoided.
公开/授权文献
信息查询
0/0