Coordinated switching in a multiple switching regulator system to lower peak current load
摘要:
The switching transistors in multiple switching regulators sharing the same input power source are coordinated to lower the peak current drain on the input power source. The turn on times of the transistors in each regulator are set so that each switching transistor turns on at a predetermined time in a cycle. The predetermined time for each regulator is chosen so that the maximum peak current drain on the input power source is minimized. The predetermined times may be changed on-the-fly by inputs to the system when information about current or projected output loads are known. The transistors in each regulator may also be turned on when the transistor in the previous regulator in a sequence turns off. Another embodiment lets the regulator with the largest change in input current over a cycle run independently. The other regulators then switch in a designated order, or at designated times after the first regulator turns its switch off.
信息查询
0/0