发明授权
US07222083B2 Resource schedule for scheduling rail way train resources 有权
铁路列车资源调度资源调度

Resource schedule for scheduling rail way train resources
摘要:
A scheduling system and method for moving plural objects through a multipath system described as a freight railway scheduling system. The scheduling system utilizes a cost reactive resource scheduler to minimize resource exception while at the same time minimizing the global costs associated with the solution. The achievable movement plan can be used to assist in the control of, or to automatically control, the movement of trains through the system.
公开/授权文献
信息查询
0/0