摘要:
A method includes determining an operational parameter of a first vehicle traveling with a plurality of vehicles in a transportation network and/or a route in the transportation network, identifying a failure condition of the first vehicle and/or the route based on the operational parameter, obtaining plural different sets of remedial actions that dictate operations to be taken based on the operational parameter, simulating travel of the plurality of vehicles in the transportation network based on implementation of the different sets of remedial actions, determining potential consequences on travel of the plurality of vehicles in the transportation network when the different sets of remedial actions are implemented in the travel that is simulated, and based on the potential consequences, receiving a selection of at least one of the different sets of remedial actions to be implemented in actual travel of the plurality of vehicles in the transportation network.
摘要:
A system and method for controlling the movement of plural trains over a rail network, where the rail network is divided into at least one control area with a dispatcher assigned to manage the movement of trains in a control area by predicting the occurrence of events along the network based on the movement plan and prompting the dispatcher to provide information or take specified actions relating to the predicted events.
摘要:
A system and method for controlling the movement of plural trains over a rail network, where the rail network is divided into at least one control area with a dispatcher assigned to manage the movement of trains in a control area by predicting the occurrence of events along the network based on the movement plan and prompting the dispatcher to provide information or take specified actions relating to the predicted events.
摘要:
A system and method for controlling the movement of plural trains over a rail network, where the rail network is divided into a plurality of planning areas with a boundary element of common track between adjacent planning areas, using a local coordinating agent for controlling the movement of the trains through the boundary elements.
摘要:
A scheduling system and method for moving plural objects through a multipath system described as a freight railway scheduling system. The scheduling system utilizes a cost reactive resource scheduler to minimize resource exception while at the same time minimizing the global costs associated with the solution. The achievable movement plan can be used to assist in the control of, or to automatically control, the movement of trains through the system.
摘要:
A scheduling system and method for moving plural objects through a multipath system described as a freight railway scheduling system. The achievable movement plan can be used to assist in the control of, or to automatically control, the movement of trains through the system.
摘要:
A scheduling system and method for moving plural objects through a multipath system described as a freight railway scheduling system. The scheduling system utilizes a cost reactive resource scheduler to minimize resource exception while at the same time minimizing the global costs associated with the solution. The achievable movement plan can be used to assist in the control of, or to automatically control, the movement of trains through the system.
摘要:
A scheduling system and method for moving plural objects through a multipath system described as a freight railway scheduling system. The scheduling system utilizes a cost reactive resource scheduler to minimize resource exception while at the same time minimizing the global costs associated with the solution. The achievable movement plan can be used to assist in the control of, or to automatically control, the movement of trains through the system.
摘要:
A scheduling system and method for moving plural objects through a multipath system described as a freight railway scheduling system. The scheduling system utilizes a cost reactive resource scheduler to minimize resource exception while at the same time minimizing the global costs associated with the solution. The achievable movement plan can be used to assist in the control of, or to automatically control, the movement of trains through the system.
摘要:
A scheduling system and method for moving plural objects through a multipath system described as a freight railway scheduling system. The achievable movement plan can be used to assist in the control of, or to automatically control, the movement of trains through the system.