Invention Grant
- Patent Title: Method for operating a combined cycle power plant
- Patent Title (中): 操作联合循环发电厂的方法
-
Application No.: US13714568Application Date: 2012-12-14
-
Publication No.: US09046037B2Publication Date: 2015-06-02
- Inventor: Stefan Eduard Broesamle , Christoph Ruchti
- Applicant: ALSTOM Technology Ltd.
- Applicant Address: CH Baden
- Assignee: ALSTOM TECHNOLOGY LTD.
- Current Assignee: ALSTOM TECHNOLOGY LTD.
- Current Assignee Address: CH Baden
- Agency: Buchanan Ingersoll & Rooney PC
- Priority: CH2024/11 20111222
- Main IPC: F02C1/00
- IPC: F02C1/00 ; F02C6/00 ; F02C7/18 ; F01K23/10 ; F02C9/18 ; F01K23/02 ; F01D19/00 ; F02C6/18 ; F02C7/141

Abstract:
A method for operating a combined cycle power plant is disclosed, which has a gas turbine installation and a water-steam cycle connected to the gas turbine installation by a waste heat steam generator and has at least one steam turbine, the gas turbine installation includes a compressor, a combustion chamber, and a turbine. To cool the turbine, air compressed at the compressor is removed, cooled in at least one cooler flowed through by water, thus generating steam, and introduced into the turbine. At least with the gas turbine installation running, prior to or during the start-up of the water-steam cycle, waste heat, which is contained in the steam generated in the at least one cooler, is used to good effect for pre-heating the installation inside the combined cycle power plant.
Public/Granted literature
- US20130160424A1 Method for Operating a Combined Cycle Power Plant Public/Granted day:2013-06-27
Information query