-
公开(公告)号:US09046037B2
公开(公告)日:2015-06-02
申请号:US13714568
申请日:2012-12-14
Applicant: ALSTOM Technology Ltd.
Inventor: Stefan Eduard Broesamle , Christoph Ruchti
IPC: F02C1/00 , F02C6/00 , F02C7/18 , F01K23/10 , F02C9/18 , F01K23/02 , F01D19/00 , F02C6/18 , F02C7/141
CPC classification number: F01K23/10 , F01D19/00 , F01K7/16 , F01K9/003 , F01K23/02 , F02C3/04 , F02C6/04 , F02C6/18 , F02C7/14 , F02C7/141 , F02C7/185 , F02C9/18 , F05D2220/32 , F05D2220/72 , F05D2260/213 , F05D2260/232 , F05D2260/2322 , Y02E20/16
Abstract: A method for operating a combined cycle power plant is disclosed, which has a gas turbine installation and a water-steam cycle connected to the gas turbine installation by a waste heat steam generator and has at least one steam turbine, the gas turbine installation includes a compressor, a combustion chamber, and a turbine. To cool the turbine, air compressed at the compressor is removed, cooled in at least one cooler flowed through by water, thus generating steam, and introduced into the turbine. At least with the gas turbine installation running, prior to or during the start-up of the water-steam cycle, waste heat, which is contained in the steam generated in the at least one cooler, is used to good effect for pre-heating the installation inside the combined cycle power plant.
Abstract translation: 公开了一种用于操作联合循环发电厂的方法,其具有燃气轮机装置和通过废热蒸汽发生器连接到燃气轮机装置的水蒸汽循环,并且具有至少一个汽轮机,燃气轮机装置包括: 压缩机,燃烧室和涡轮。 为了冷却涡轮机,去除在压缩机处被压缩的空气,在至少一个由水流过的冷却器中冷却,从而产生蒸汽并引入涡轮。 至少在燃气轮机安装运行时,在水蒸汽循环启动之前或期间,包含在至少一个冷却器中产生的蒸汽中的废热被用于对预热的良好效果 联合循环发电厂内的安装。
-
公开(公告)号:US20130160424A1
公开(公告)日:2013-06-27
申请号:US13714568
申请日:2012-12-14
Applicant: ALSTOM Technology Ltd.
Inventor: Stefan Eduard Broesamle , Christoph Ruchti
CPC classification number: F01K23/10 , F01D19/00 , F01K7/16 , F01K9/003 , F01K23/02 , F02C3/04 , F02C6/04 , F02C6/18 , F02C7/14 , F02C7/141 , F02C7/185 , F02C9/18 , F05D2220/32 , F05D2220/72 , F05D2260/213 , F05D2260/232 , F05D2260/2322 , Y02E20/16
Abstract: In a method for operating a combined cycle power plant (10), which has a gas turbine installation (11) and a water-steam cycle (21) connected to the gas turbine installation (11) by a waste heat steam generator (24) and has at least one steam turbine (23), the gas turbine installation (11) includes a compressor (13), a combustion chamber (14), and a turbine (16). To cool the turbine (16), air compressed at the compressor (13) is removed, cooled in at least one cooler (18, 19) flowed through by water, thus generating steam, and introduced into the turbine (16). At least with the gas turbine installation (11) running, prior to or during the start-up of the water-steam cycle (21), waste heat, which is contained in the steam generated in the at least one cooler (18, 19), is used to good effect for pre-heating the installation inside the combined cycle power plant (10).
Abstract translation: 在具有燃气轮机装置(11)和通过废热蒸汽发生器(24)连接到燃气轮机装置(11)的水蒸汽循环(21))的联合循环发电厂(10)的操作方法中, 并且具有至少一个汽轮机(23),所述燃气轮机装置(11)包括压缩机(13),燃烧室(14)和涡轮机(16)。 为了冷却涡轮机(16),去除在压缩机(13)处被压缩的空气,在至少一个由水流过的冷却器(18,19)中冷却,由此产生蒸汽并被引入涡轮机(16)。 至少在燃气轮机装置(11)运行时,在水蒸汽循环(21)启动之前或期间,废热被包含在至少一个冷却器(18,19)中产生的蒸汽中 )用于对联合循环发电厂(10)内的安装进行预热的良好效果。
-