发明授权
US09085727B2 Heterogeneous proppant placement in a fracture with removable extrametrical material fill
有权
不均匀支撑剂放置在具有可移除的外延材料填充物的断裂中
- 专利标题: Heterogeneous proppant placement in a fracture with removable extrametrical material fill
- 专利标题(中): 不均匀支撑剂放置在具有可移除的外延材料填充物的断裂中
-
申请号: US13548760申请日: 2012-07-13
-
公开(公告)号: US09085727B2公开(公告)日: 2015-07-21
- 发明人: Fedor Nikolaevich Litvinets , Andrey Vladimirovich Bogdan , Sergey Mikhailovich Makarychev-Mikhailov , Oleg Medvedev , Alejandro Pena , Konstantin Mikhailovich Lyapunov , Alexander Vuacheslavovich Mikhaylov , Timothy M. Lesko , J. Ernest Brown , Dean M. Willberg , Ivan Vitalievich Kosarev , Anatoly Vladimirovich Medvedev , Jonathan Abbott , Alexander Alexandrovich Burukhin
- 申请人: Fedor Nikolaevich Litvinets , Andrey Vladimirovich Bogdan , Sergey Mikhailovich Makarychev-Mikhailov , Oleg Medvedev , Alejandro Pena , Konstantin Mikhailovich Lyapunov , Alexander Vuacheslavovich Mikhaylov , Timothy M. Lesko , J. Ernest Brown , Dean M. Willberg , Ivan Vitalievich Kosarev , Anatoly Vladimirovich Medvedev , Jonathan Abbott , Alexander Alexandrovich Burukhin
- 申请人地址: US TX Sugar Land
- 专利权人: Schlumberger Technology Corporation
- 当前专利权人: Schlumberger Technology Corporation
- 当前专利权人地址: US TX Sugar Land
- 代理商 Rachel E. Greene; Tim Curington
- 主分类号: E21B43/267
- IPC分类号: E21B43/267 ; C09K8/66 ; C09K8/68 ; C09K8/70 ; C09K8/72 ; C09K8/80
摘要:
A method of heterogeneous proppant placement in a subterranean fracture is disclosed. The method comprises injecting well treatment fluid including proppant (16) and proppant-spacing filler material (18) through a wellbore (10) into the fracture (20), heterogeneously placing the proppant in the fracture in a plurality of proppant clusters or islands (22) spaced apart by the material (24), and removing the filler material (24) to form open channels (26) around the pillars (28). The filler material can be dissolvable particles, initially acting as a consolidator during placement of the proppant in the fracture, and later dissolving to leave flow channels between the proppant pillars. The well treatment fluid can include extrametrical materials to provide reinforcement and consolidation of the proppant and, additionally or alternatively, to inhibit settling of the proppant in the treatment fluid.
公开/授权文献
信息查询
IPC分类: