Invention Grant
- Patent Title: Method for operating a pressurized water reactor during load monitoring
-
Application No.: US14005065Application Date: 2012-03-15
-
Publication No.: US09905321B2Publication Date: 2018-02-27
- Inventor: Alain Grossetete
- Applicant: Alain Grossetete
- Applicant Address: FR Courbevoie
- Assignee: Areva NP
- Current Assignee: Areva NP
- Current Assignee Address: FR Courbevoie
- Agency: Pearl Cohen Zedek Latzer Baratz LLP
- Priority: FR1152101 20110315
- International Application: PCT/FR2012/050548 WO 20120315
- International Announcement: WO2012/123685 WO 20120920
- Main IPC: G21C7/08
- IPC: G21C7/08 ; G21D3/00 ; G21C7/22 ; G21D3/10 ; G21D3/16

Abstract:
The present invention relates to a method for controlling a pressurized water reactor (100) comprising the steps that involve measuring the effective power (Pe) of the nuclear reactor; acquiring a reference value for the desired power (Pc); acquiring an estimated duration (DURATION) for the increase in power in order to achieve said reference value of the target power (Pc) desired, said estimated duration (DURATION) corresponding to the time taken for the power to increase from said effective power (Pe) to said reference value for the target power (Pc); determining the reference position (Z) of at least one control rod cluster among said plurality of control rod clusters (40) in order to achieve said reference value for said target power (Pc) desired as a function of said estimated duration (DURATION), of said measured effective power (Pe) and of said reference value for said target power (Pc); monitoring the position of said at least one control rod cluster so as to position it in its reference position (Z).
Public/Granted literature
- US20160329116A1 METHOD FOR OPERATING A PRESSURIZED WATER REACTOR DURING LOAD MONITORING Public/Granted day:2016-11-10
Information query