Invention Grant
- Patent Title: Optimized asset maintenance and replacement schedule
-
Application No.: US14796704Application Date: 2015-07-10
-
Publication No.: US09959515B2Publication Date: 2018-05-01
- Inventor: Dung Phan , Jinjun Xiong
- Applicant: International Business Machines Corporation
- Applicant Address: US NY Armonk
- Assignee: International Business Machines Corporation
- Current Assignee: International Business Machines Corporation
- Current Assignee Address: US NY Armonk
- Agency: Scully, Scott, Murphy & Presser, P.C.
- Agent Daniel Morris, Esq.
- Main IPC: G06F11/30
- IPC: G06F11/30 ; G21C17/00 ; G06Q10/06 ; G01M99/00 ; G06Q10/00

Abstract:
There are provided a system, a method and a computer program product for generating an optimal preventive maintenance/replacement schedule for a set of assets. The method includes receiving data regarding an asset, said data including a failure rate function of said asset, a cost of preventative maintenance (PM) of said asset, a cost of an asset failure, and a cost of replacing an asset. An optimal number K of preventative maintenance time intervals tk and an indication of a possible replacement is computed and stored for each asset by minimizing a mean cost-rate value function with respect to an electrical age of the asset. A first PM schedule is formed without consideration of labor and budget resource constraints. The method further generates a second maintenance schedule for a system of assets by minimizing a deviation from the optimal PM time intervals subject to the labor and budget resource constraints.
Public/Granted literature
- US20160148137A1 OPTIMIZED ASSET MAINTENANCE AND REPLACEMENT SCHEDULE Public/Granted day:2016-05-26
Information query