VERFAHREN ZUM SETZEN VON GESTEINSANKERN
    12.
    发明公开
    VERFAHREN ZUM SETZEN VON GESTEINSANKERN 有权
    过程设置岩石锚杆

    公开(公告)号:EP1805395A1

    公开(公告)日:2007-07-11

    申请号:EP05810675.8

    申请日:2005-10-21

    IPC分类号: E21D20/02 E02D5/80

    摘要: According to the invention, a drill rod comprising an inner channel is drilled into the rock. A free-flowing, self-hardening mass is pressed through the inner channel of the drill rod, filling the drilled hole, so that it hardens with the drill rod remaining in the drilled hole. The hardening mass is a mixture of a hardenable plastic and a hardening plastic. Said plastics are supplied to the inner channel of the drill rod over a pre-determined transport time F which corresponds to the hardening time. The hardening time is defined by the selection of the plastics and the mixing ratio thereof such that the transport time essentially corresponds to the hardening time and leads essentially to the flow path of the hardened mixture being completely filled between the mixing point and the output of the drilled hole.

    CEMENTITIOUS COMPOSITIONS AND A METHOD OF THEIR USE
    13.
    发明授权
    CEMENTITIOUS COMPOSITIONS AND A METHOD OF THEIR USE 有权
    黏结剂组合物及其使用方法

    公开(公告)号:EP1230190B1

    公开(公告)日:2003-11-26

    申请号:EP00971524.4

    申请日:2000-10-19

    IPC分类号: C04B28/06

    摘要: A settable composition suitable for coating surfaces eg walls of a mine comprises (i) a cementitious composition comprising the following components:(a) at least 25% preferably at least 40% of a reactive cement having a C to A or(A + X) ratio of greater than 1:1 preferably greater than 1.2:1,where X is S* or S or F (b) from 0 to 10% of lime and(c) from 5 to 70% preferably 10 to 40% of calcium sulphate,and where the sum of (b) and (c) is at least 15%the % being by weight based on the combined weight of (a), (b) and (c) and where the proportions of the components are such that the composition on hydration is capable of absorbing at least its own weight of water and(ii) an aqueous emulsion of an organic polymer, the amount of (ii) in relation to (i) being such as to provide a weight ratio of polymer solids to combined weight of (a), (b)) and (c) of from 0.5:1 to 10:1, preferably 0.7:1 to 2:1 or(iii) an organic polymer in the form of a powder dispersible in water and where the amount of organic polymer is such as to give a weight ratio of polymer solids to combined weight of (a), (b) and (c) of from 0.5:1 to 10:1, preferably 0.7:1 to 2:1 andwhere the proportions of the components are selected from within the above defined ranges to provide a composition which on hydration will have a tensile strength at 4 hours of at least 135psi and an elongation at 7 days of at least 20 %.When the composition contains components (i) and (ii) the amount of water can be equal to at least 50% by weight of the weight of the cementitious composition (i), preferably from 70% to 250%.

    DEVICE FOR A DRAINAGE BORING SYSTEM
    16.
    发明公开
    DEVICE FOR A DRAINAGE BORING SYSTEM 审中-公开
    一种排水钻孔系统的装置

    公开(公告)号:EP2805015A2

    公开(公告)日:2014-11-26

    申请号:EP13706671.8

    申请日:2013-01-21

    摘要: The present invention provides a device providing a combined boring and placement system for jacket tubes (5), which after introduction into a borehole, for the creation of a drainage system or a pipe roof or an anchoring or a tubular pile, remain in the rock mass and which, when creating the borehole, with an extension piece (4) of a drill rod assembly (2), wherein the extension piece (4) is fitted with a non-recoverable drill bit (6) which for this purpose can be partially or fully detached from the extension piece (4), wherein the drill bit(6) is connected with the assigned extension piece(4) of the drill rod assembly(2) via a locking element (20) that secures it against rotation, which to this end is arranged in a cage (21) formed by the drill bit (6), extension piece(4) and jacket tube(5) and which can be released by the jacket tube (5) covering the cage (21).

    摘要翻译: 本发明提供了一种为套管(5)提供组合的钻孔和放置系统的装置,该套管在引入钻孔后用于创建排水系统或管顶或锚固或管桩保留在岩石中 并且在钻孔时与钻杆组件(2)的延伸件(4)一起构造,其中延伸件(4)装配有不可恢复的钻头(6),该钻头为此可以是 部分地或完全地从延伸件(4)上分离,其中钻头(6)经由锁定元件(20)与钻杆组件(2)的分配的延伸件(4)连接, 其为此设置在由钻头(6),延伸件(4)和护套管(5)形成的笼子(21)中并且可以通过覆盖笼子(21)的护套管(5)释放, 。

    Anchor with grout jacket
    18.
    发明公开
    Anchor with grout jacket 审中-公开
    与水泥夹克锚

    公开(公告)号:EP2096258A2

    公开(公告)日:2009-09-02

    申请号:EP09007562.3

    申请日:2007-12-19

    IPC分类号: E21D20/02 E21D21/00 E02D5/80

    摘要: An anchor 1 for consolidating non-cohesive rock layers or for connecting them to solid rock 2 primarily has the necessary components for realising a stressed or expansion anchor. Furthermore, when a conventional domed plate 10 is used, which reliably transmits the necessary stress forces, it is possible additionally to bond the anchor bar 4 in the drill hole 3 after stressing. To this end, the anchor bar 4 is either constructed with a connecting tube 22 with distributor head 24 or the sheathing tube 11 comprises a top tube 50, these both fulfilling the task of conveying the grout bonding material 12 reliably from the drill hole mouth end of the anchor bar 4 to the rock end 5A and then diverting it there and returning it to the drill hole mouth, so ensuring complete fixing and sheathing of the anchor bar 4 in the drill hole 3.

    摘要翻译: 用于固结非粘性岩层或用于将它们连接到固体岩石2的锚1主要具有用于实现应力或膨胀锚的必要组件。 此外,当使用传统的圆顶板10,其可靠地传递必要的应力时,可以另外在应力后将锚杆4结合在钻孔3中。 为此,锚杆4构造有具有分配器头24的连接管22或者套管11包括顶管50,这两者都履行了从钻孔口端可靠地传送灌浆粘结材料12的任务 将锚杆4连接到岩石端部5A,然后将其转移到那里并将其返回到钻孔口,从而确保锚杆4在钻孔3中的完全固定和护套。

    Anchor with grout jacket
    19.
    发明公开

    公开(公告)号:EP1939394A3

    公开(公告)日:2009-01-28

    申请号:EP07254935.5

    申请日:2007-12-19

    IPC分类号: E21D20/02 E21D21/00 E02D5/80

    摘要: An anchor 1 for consolidating non-cohesive rock layers or for connecting them to solid rock 2 primarily has the necessary components for realising a stressed or expansion anchor. Furthermore, when a conventional domed plate 10 is used, which reliably transmits the necessary stress forces, it is possible additionally to bond the anchor bar 4 in the drill hole 3 after stressing. To this end, the anchor bar 4 is either constructed with a connecting tube 22 with distributor head 24 or the sheathing tube 11 comprises a top tube 50, these both fulfilling the task of conveying the grout bonding material 12 reliably from the drill hole mouth end of the anchor bar 4 to the rock end 5A and then diverting it there and returning it to the drill hole mouth, so ensuring complete fixing and sheathing of the anchor bar 4 in the drill hole 3.