SCHIENENBEFESTIGUNGSSYSTEM FÜR ÜBERGANGSBEREICHE
    14.
    发明公开
    SCHIENENBEFESTIGUNGSSYSTEM FÜR ÜBERGANGSBEREICHE 审中-公开
    导轨安装系统过渡区

    公开(公告)号:EP2877636A1

    公开(公告)日:2015-06-03

    申请号:EP13747806.1

    申请日:2013-07-22

    申请人: SCHWIHAG AG

    IPC分类号: E01B9/48 E01B9/68 E01B2/00

    摘要: The invention relates to a rail attachment system (1) for attaching a rail (2) to a concrete support slab (3a) or a concrete sleeper (3b) or to a steel structure comprising an intermediate plate (4), a rail attachment plate (5) with angle guide plates (6, 6b) arranged thereon, at least two first tensioning clamps (7a) for clamping the rail foot (2a) to the rail attachment plate (5) as well as screws (9) and/or ankle bolts (10) and at least two second tensioning clamps for screwing the rail attachment system (1) to the underlying surface, characterized in that an elastic intermediate layer (8)is arranged between the rail (2) and the rail attachment plate (5), and the intermediate plate (4) is composed of a highly elastic material and/or comprises a steel plate (4), at least two second tensioning clamps (7b) for clamping the rail attachment plate (5) to the substructure, preferably via the intermediate plate (4), wherein the first and second tensioning clamps (7a, 7b) are embodied in a highly elastic fashion with a high tensioning force, are provided, and at least one upper sliding plate (12) is arranged between the rail foot (2a) and a first tensioning clamp (7a), and at least one lower sliding plate (13) is arranged between the rail foot (2a) and the elastic intermediate layer (8) and is attached by means of a steel support (14) in the case of a steel substructure.

    Method for the installation of slab tracks in twin tube tunnels
    15.
    发明公开
    Method for the installation of slab tracks in twin tube tunnels 审中-公开
    一种用于在双管隧道安装轨道板的过程

    公开(公告)号:EP2264244A3

    公开(公告)日:2014-02-19

    申请号:EP10165682.5

    申请日:2010-06-11

    IPC分类号: E01B1/00 E01B2/00 E01B29/00

    摘要: A method is described for the installation of slab tracks in tunnels, in particular tracks on a slab of concrete, with the optimised design and execution characteristics, and substantially increased performance compared to the normal known methods. The method includes a succession of phases executed in order, with the help of an auxiliary track, Consisting of the design of the construction section, the construction of the railway yards, assembly of the auxiliary track from the evacuation platform, execution of the foundation base, assembly of the track in slabs, transitions from slab track - ballast track, and placement of long bars and welding.

    Rail supporting assembly with cushioning fastening elements
    16.
    发明公开
    Rail supporting assembly with cushioning fastening elements 审中-公开
    与弹性紧固件支承轨道布置

    公开(公告)号:EP2287400A3

    公开(公告)日:2013-10-09

    申请号:EP10171911.0

    申请日:2010-08-04

    申请人: Fronema S.r.L.

    IPC分类号: E01B1/00 E01B2/00 E01B19/00

    摘要: There is disclosed an assembly (100) for supporting and fastening to the ground (10) rails railway and/or subway lines with cushioning of vibrations, comprising a plurality of slabs (1) comprising fastening means (11) in the form of a parallelepiped formed by a rigid central structure (15) fixed to the plane (10) bearing said slab and by a cushioning frame (12) which surrounds said central part (15), said means being housed in a through cavity (8) formed by two recesses (4) of two adjacent slabs (1) formed on the sides (5) of said slabs (1) perpendicular to the longitudinal axis (3) of said rails (21).

    Rail supporting assembly with cushioning fastening elements
    18.
    发明公开
    Rail supporting assembly with cushioning fastening elements 审中-公开
    Schienenunterstützungs-Anordnung mit federnden Befestigungselementen

    公开(公告)号:EP2287400A2

    公开(公告)日:2011-02-23

    申请号:EP10171911.0

    申请日:2010-08-04

    申请人: Fronema S.r.L.

    IPC分类号: E01B1/00 E01B2/00 E01B19/00

    摘要: There is disclosed an assembly (100) for supporting and fastening to the ground (10) rails railway and/or subway lines with cushioning of vibrations, comprising a plurality of slabs (1) comprising fastening means (11) in the form of a parallelepiped formed by a rigid central structure (15) fixed to the plane (10) bearing said slab and by a cushioning frame (12) which surrounds said central part (15), said means being housed in a through cavity (8) formed by two recesses (4) of two adjacent slabs (1) formed on the sides (5) of said slabs (1) perpendicular to the longitudinal axis (3) of said rails (21).

    摘要翻译: 公开了一种用于支撑和紧固到地面(10)轨道和/或具有振动缓冲的地铁线路的组件(100),包括多个平板(1),其包括平行六面体形式的紧固装置(11) 由固定到承载所述板坯的平面(10)的刚性中心结构(15)和围绕所述中心部分(15)的缓冲框架(12)形成,所述装置容纳在由两个 形成在与所述轨道(21)的纵向轴线(3)垂直的所述板坯(1)的侧面(5)上的两个相邻板坯(1)的凹部(4)。

    Method for the installation of slab tracks in twin tube tunnels
    19.
    发明公开
    Method for the installation of slab tracks in twin tube tunnels 审中-公开
    Verfahren zur安装von Gleisplatten在Doppelröhrentunneln

    公开(公告)号:EP2264244A2

    公开(公告)日:2010-12-22

    申请号:EP10165682.5

    申请日:2010-06-11

    IPC分类号: E01B1/00 E01B2/00

    摘要: A method is described for the installation of slab tracks in tunnels, in particular tracks on a slab of concrete, with the optimised design and execution characteristics, and substantially increased performance compared to the normal known methods. The method includes a succession of phases executed in order, with the help of an auxiliary track, Consisting of the design of the construction section, the construction of the railway yards, assembly of the auxiliary track from the evacuation platform, execution of the foundation base, assembly of the track in slabs, transitions from slab track - ballast track, and placement of long bars and welding.

    摘要翻译: 描述了一种方法,用于在隧道中,特别是混凝土板上的轨道上安装板坯轨道,具有优化的设计和执行特性,并且与常规已知方法相比显着提高了性能。 该方法包括在辅助轨道的帮助下按顺序执行的连续阶段,包括施工部分的设计,铁路场的建设,撤离平台的辅助轨道的组装,基础基础的执行 ,轨道在板坯中的组装,从平板轨道 - 镇流器轨道的过渡,以及长条和焊接的放置。