Scaffold arrangement
    21.
    发明授权
    Scaffold arrangement 有权
    站安排

    公开(公告)号:EP1972737B8

    公开(公告)日:2015-09-02

    申请号:EP08001216.4

    申请日:2008-01-23

    发明人: Taylor, Mark

    摘要: A scaffold arrangement (1) comprising a scaffold component (2) and a support unit (3) for releasably supporting the scaffold component in an operative position on a scaffold assembly or building, the support unit (3) comprising a mounting portion for fixedly mounting the support unit to said scaffold assembly, a supporting member for seating a first part of the scaffold component, and a releasable locking member moveable to a locking position for locking the scaffold component to the support unit, the arrangement being such that when the scaffold component (2) is seated on the supporting member in said operative position, and the locking member is in said locking position, the locking member is spaced immediately below a second part of the scaffold component (2) and acts as a back-up supporting member for arresting uncontrolled downward movement of the scaffold component (2) relative to the support unit (3).

    Self-climbing system for scaffold units in construction works of buildings
    22.
    发明公开
    Self-climbing system for scaffold units in construction works of buildings 有权
    Selbstkletterndes SystemfürGerüsteinheitenbei Bauarbeiten aGebäuden

    公开(公告)号:EP2871304A1

    公开(公告)日:2015-05-13

    申请号:EP13382457.3

    申请日:2013-11-12

    IPC分类号: E04G11/28

    摘要: Self-climbing scaffold system comprising rails (3), shoes (10,11,12) fixed to concrete sections (13,14,15) of the building and adapted for guiding the rail (3) in a climbing direction (Z). The system further comprises a guide element (30) pivotably coupled to the rail (3) comprising at least a first guide surface (31,32) which, in a prior position before a threading position for threading the rail (3), projects with respect to the rail (3) towards the corresponding concrete section (13,14,15), said first guide surface (31,32) being adapted for contacting with the shoe (10) in said prior position and straightening the rail (3) with respect to the shoe (10) as said first guide surface (31,32) moves in a guided manner in the shoe (10) pivoting with respect to the rail (3).

    摘要翻译: 自爬式脚手架系统,包括轨道(3),固定到建筑物的混凝土部分(13,14,15)的鞋子(10,11,12),并适于沿着攀爬方向(Z)引导轨道(3)。 所述系统还包括可枢转地联接到所述轨道(3)的引导元件(30),所述引导元件(30)包括至少第一引导表面(31,32),所述第一引导表面在用于穿过所述轨道(3)的穿线位置之前的先前位置中以 相对于轨道(3)朝向相应的混凝土部分(13,14,15),所述第一引导表面(31,32)适于在所述先前位置与鞋(10)接触并矫直轨道(3) 相对于所述第一引导表面(31,32)以相对于所述轨道(3)枢转的所述鞋(10)中的引导方式移动而相对于所述鞋(10)。

    Wall bracket
    23.
    发明公开
    Wall bracket 审中-公开
    壁挂支架

    公开(公告)号:EP2706167A3

    公开(公告)日:2014-11-26

    申请号:EP13183469.9

    申请日:2013-09-09

    IPC分类号: E04G3/20 E04G5/06 E04G5/04

    CPC分类号: E04G3/20 E04G5/046 E04G5/062

    摘要: The invention relates to a wall bracket for facilitating construction work. The wall bracket comprises a support structure (110) to be fastened to a wall (12), and a bracket structure (120) to be placed to rest on the support structure as a working surface and fall arrest for a person (30) or another load. The bracket structure to be placed to rest on the support structure (110) to be fastened to a wall comprises a working platform frame (150) which forms at least two different height positions and is provided with an upper support (152) and a lower support (154) for at least partly non-superimposed working platforms (152a, 154a).

    摘要翻译: 本发明涉及一种便于施工作业的墙壁支架。 所述壁式支架包括待固定到壁(12)的支撑结构(110)和待放置成作为工作表面支撑在所述支撑结构上的支架结构(120),并且用于人(30)或 另一个负载。 待放置在支撑结构(110)上以固定到墙上的托架结构包括工作平台框架(150),该工作平台框架形成至少两个不同的高度位置并且设置有上支撑件(152)和下支撑件 用于至少部分非重叠的工作平台(152a,154a)的支撑(154)。

    Scaffold arrangement
    24.
    发明公开
    Scaffold arrangement 有权
    Gerüstanordnung

    公开(公告)号:EP1972737A3

    公开(公告)日:2011-07-13

    申请号:EP08001216.4

    申请日:2008-01-23

    发明人: Taylor, Mark

    摘要: A scaffold arrangement (1) comprising a scaffold component (2) and a support unit (3) for releasably supporting the scaffold component in an operative position on a scaffold assembly or building, the support unit (3) comprising a mounting portion for fixedly mounting the support unit to said scaffold assembly, a supporting member for seating a first part of the scaffold component, and a releasable locking member moveable to a locking position for locking the scaffold component to the support unit, the arrangement being such that when the scaffold component (2) is seated on the supporting member in said operative position, and the locking member is in said locking position, the locking member is spaced immediately below a second part of the scaffold component (2) and acts as a back-up supporting member for arresting uncontrolled downward movement of the scaffold component (2) relative to the support unit (3).

    摘要翻译: 一种脚手架装置(1),包括支架部件(2)和用于将脚手架部件可释放地支撑在支架组件或建筑物上的操作位置的支撑单元(3),所述支撑单元(3)包括用于固定安装 支撑单元到所述支架组件,支撑构件,用于支撑所述支架组件的第一部分;以及可释放的锁定构件,其可移动到锁定位置,用于将所述支架组件锁定到所述支撑单元,所述布置使得当所述支架组件 (2)在所述操作位置处就座于所述支撑构件上,并且所述锁定构件处于所述锁定位置,所述锁定构件紧邻在所述脚手架构件(2)的第二部分下方并且用作支撑支撑构件 用于防止脚手架组件(2)相对于支撑单元(3)的不受控制的向下运动。

    Structure pliable perfectionnée de travail en encorbellement
    26.
    发明公开
    Structure pliable perfectionnée de travail en encorbellement 有权
    为平衡悬臂完善折叠建设工作

    公开(公告)号:EP1905921A1

    公开(公告)日:2008-04-02

    申请号:EP07291127.4

    申请日:2007-09-21

    申请人: Sateco

    IPC分类号: E04G3/20

    CPC分类号: E04G3/20 E04G5/06 E04G5/062

    摘要: Cette structure comprend un plateau (3), au moins un montant (5) articulé à une extrémité sur le plateau (3) autour d'un axe d'articulation (4) sensiblement parallèle au plateau, entre une position pliée et une position dépliée d'utilisation sensiblement orthogonale au plateau,au moins un bracon pliable (7), reliant le plateau (3) et le montant (5), et comprenant deux béquilles tubulaires (11, 12) articulées l'une sur l'autre, et des moyens libérables (30, 34) de blocage du bracon (7) en position dépliée.
    La structure comprend un talon d'appui au sol (6) solidaire du montant (5) à l'extrémité libre de ce dernier opposée à l'extrémité d'articulation, ledit talon (6) faisant saillie de l'extrémité libre du montant (5) et étant, en position dépliée du montant, décalé par rapport au plan orthogonal au plateau (3) passant par l'axe d'articulation (4).