DISMANTLING METHOD FOR SMOKESTACKS
    1.
    发明授权
    DISMANTLING METHOD FOR SMOKESTACKS 有权
    SMOKESTACKS的解散方法

    公开(公告)号:EP2918748B1

    公开(公告)日:2017-12-27

    申请号:EP12888088.7

    申请日:2012-11-08

    摘要: There is provided an aggregate stack demolishing scaffold apparatus capable of easily demolishing even an aggregate stack with safety at low cost, and a demolishing method using the apparatus. An aggregate stack demolishing scaffold apparatus 10 to be mounted to an upper part of an aggregate stack 130 including four smoke funnels 132 arranged adjacent to each other includes: an uneven scaffold including a one plate-shaped upper scaffold portion 14 that can be placed on an upper end of each smoke funnel 132, and lower scaffold portions 18 coupled to the upper scaffold portion 14 and located in lower positions in the smoke funnels 132 with the upper scaffold portion 14 being placed on the upper ends of the smoke funnels 132; and a chain block 28 capable of suspending and supporting the uneven scaffold from and on an inner wall of each smoke funnel 132, and adjusting a suspending height. With this configuration, the one plate-shaped upper scaffold portion 14 is located on the upper ends of the smoke funnels 132, and thus there is no possibility that a contact between scaffolds vertically moves the lower scaffold portions in the smoke funnels causing a worker to lose his balance, thereby improving safety.

    Working scaffold girder structure for a boiler furnace
    2.
    发明公开
    Working scaffold girder structure for a boiler furnace 有权
    脚手架支撑结构的焚化炉

    公开(公告)号:EP2840202A1

    公开(公告)日:2015-02-25

    申请号:EP14181740.3

    申请日:2014-08-21

    申请人: Hitachi Ltd.

    摘要: In order to provide a working scaffold girder structure 10 in a boiler furnace 12, a working scaffold girder carriage apparatus 100, and a method of installing a working scaffold, by which the working scaffold can be easily installed/removed in/from the boiler furnace 12, a working scaffold girder structure 10 in a boiler furnace includes: a girder body 20 that is formed by vertically stacking a pair of H-beams such that a flange of one of the H-beams faces a flange of the other H-beam and providing a truss structure 26 between the flanges; and a stringer 60 having one end supported by a side surface of the girder body 20 and the other end connectable to a side surface of a neighboring girder body 20, the stringer being foldable or unfoldable in a hinged manner with respect to the one end from the side surface of the girder body in a direction intersecting with a longitudinal direction of the girder body.

    CABLE INSTALLATION APPARATUS FOR MOUNTING ON A FLANGED STRUCTURE
    3.
    发明公开
    CABLE INSTALLATION APPARATUS FOR MOUNTING ON A FLANGED STRUCTURE 审中-公开
    KABELINSTALLATIONSVORRICHTUNG ZUR MONTAGE AN EINER GEFLANSCHTEN STRUKTUR

    公开(公告)号:EP2773868A1

    公开(公告)日:2014-09-10

    申请号:EP12784043.7

    申请日:2012-10-23

    申请人: Technip France

    发明人: MACKAY, David

    IPC分类号: F03D1/00 F03D11/00 H02G1/08

    摘要: A cable installation apparatus (2) for mounting on a structure (20) having an internal flange (26) defining an opening at one end, comprising a platform (4); a cable winch (14) mounted on the platform; and a base portion (6) for supporting the platform and attachable to the flange of the structure; wherein the base portion (6) comprises at least one guide member (10) adapted to engage with the flange (26) on which the apparatus is to be mounted to guide the same on to the structure. The apparatus in accordance with the present invention allows the same to be quickly, simply, safely and therefore inexpensively installed on a flanged end of a structure, such as a turbine tower section, in a single lifting and alignment operation.

    摘要翻译: 一种用于安装在具有在一端限定开口的内部凸缘26的结构20上的电缆安装装置2,包括平台4; 安装在平台上的电缆绞盘14; 以及用于支撑平台并可附接到结构的凸缘的基部6; 其中基部6包括至少一个引导构件10,该引导构件10适于与其上安装有装置的凸缘26接合以将其引导到结构上。 根据本发明的装置允许其在单个提升和对准操作中快速,简单地,安全地并因此廉价地安装在诸如涡轮机塔架部分的结构的凸缘端上。

    Oberwagen einer Befahranlage
    4.
    发明公开
    Oberwagen einer Befahranlage 有权
    服务提升的上层建筑

    公开(公告)号:EP2677094A2

    公开(公告)日:2013-12-25

    申请号:EP13172348.8

    申请日:2013-06-17

    发明人:

    IPC分类号: E04G3/24 E04G3/28 E04G3/34

    摘要: Die vorliegende Erfindung betrifft einen Oberwagen einer Befahranlage mit einem Basisträger (1) vorgegebener Längserstreckung, mehreren an dem Basisträger (1) montierten Laufrädern (2), über welche der Basisträger (1) an der Oberseite einer Bauwerkswand (K) verfahrenbar abgestützt werden kann, und mehreren Trägern (5, 6, 7), die beidseits der Laufräder (2) von dem Basisträger (1) nach unten abragen und Führungsrollen (4) tragen, die den inneren und äußeren Seitenflächen einer Bauwerkswand (K) zugeordnet sind, um den Basisträger (1) an den Seitenflächen abzustützen, wobei wenigstens ein der inneren und/oder der äußeren Seitenflächen der Bauwerkswand (K) zugeordneter Träger (5, 6, 7) an dem Basisträger (1) verstellbar angebracht und in unterschiedlichen Positionen in der Längserstreckung des Basisträgers (1) befestigbar ist, wobei wenigstens ein verstellbarer Träger (5, 6, 7) an dem Basisträger (1) über einen Diagonalträger (9, 13) verstellbarer Länge abgestützt ist.

    摘要翻译: 本发明涉及一种服务电梯的上部结构到基载体(1)的预定纵向延伸的,安装在基座载体(1)更多的轮子(2),通过该基架(1)上的建筑物壁(K)的顶部可以verfahrenbar支撑, 和多个支撑件(5,6,7)上的行驶轮(2)的基部支撑的(1)向下突出和导向辊(4)携带,其与建筑物墙壁(K)的内表面和外侧表面相关联的两侧向 基架(1)在侧面上的熊,其中所述建筑物的墙壁的相关联的支持(K)的内和/或外侧面中的至少一个(5,6,7)的基载波(1)上可调节地在纵向延伸安装,并且在不同的位置 可附接基部托架(1),其特征在于,至少一个可调节支撑件(5,6,7),通过一个对角梁调节的长度分层的基载体(1)(9,13)上 是TZT。

    Access apparatus
    5.
    发明公开
    Access apparatus 审中-公开
    Zugangsvorrichtung

    公开(公告)号:EP2088258A2

    公开(公告)日:2009-08-12

    申请号:EP09152490.0

    申请日:2009-02-10

    IPC分类号: E04G3/24

    CPC分类号: E04G3/24 E04G3/246

    摘要: An access apparatus (1) is provided, the apparatus (1) comprising a suspension structure (2), a support structure (3) adapted to suspend said suspension structure (2) through an access opening (50), and a platform assembly (4), the platform assembly (4) comprising a platform structure moveable between a stowed position substantially adjacent said suspension structure (2) and a working position extending outwardly from said suspension structure (2), to facilitate suspension and deployment of the access apparatus (1) in a covered cavity or reservoir through a restricted access opening (50).

    摘要翻译: 提供了一种进入装置(1),所述装置(1)包括悬挂结构(2),适于通过进入开口(50)悬挂所述悬挂结构(2)的支撑结构(3)和平台组件 平台组件(4)包括可在基本上邻近所述悬挂结构(2)的收起位置和从所述悬挂结构(2)向外延伸的工作位置之间移动的平台结构,以便于所述进入装置的悬挂和展开 1)通过受限制的进入开口(50)在被覆盖的空腔或储存器中。

    WORKING DEVICE FOR INNER WALL SURFACE OF TOWER TANK, AND INNER WALL SURFACE WORKING METHOD USING THE SAME
    7.
    发明公开
    WORKING DEVICE FOR INNER WALL SURFACE OF TOWER TANK, AND INNER WALL SURFACE WORKING METHOD USING THE SAME 审中-公开
    DEVICE FOR TANK塔内墙壁表面处理和此过程中用于处理内壁表面的

    公开(公告)号:EP1514636A1

    公开(公告)日:2005-03-16

    申请号:EP03721082.0

    申请日:2003-05-08

    摘要: By using a construction in which a suspended beam structure (9) is suspended from a suspension support base (8) that has been installed inside a tower structure (1), in a manner that enables movement up and down of the suspended beam structure, an operations unit (20) is attached to the suspended beam structure (9) via a guide mechanism (Z) , in a manner that enables movement up and down, and/or left and right, and operations such as welding are then performed on an inner wall surface (1d) of the tower structure (1) using the operations unit (20), the operating height position for the operations unit (20) is easily altered by moving the suspended beam structure (9) up or down, the operation for adjusting levels during operations is markedly simplified, or even unnecessary, and the safety and operating efficiency of operations is improved.

    摘要翻译: 通过使用其中一个结构的悬挂梁结构(9)由一个悬架支撑底座(8)做了已经以这样的方式一个塔结构(1)的内部安装确实启用运动向上和悬挂梁结构的向下悬挂, 到操作单元(20)被附接到经由引导机构(Z)的悬浮梁结构(9),以这样的方式做了启用上下运动,和/或左和右,和操作:诸如焊接然后,进行上 在使用操作单元(20),用于操作单元的操作高度位置(20)的塔结构(1)的内壁面(1d)中很容易被移动悬挂梁结构(9)向上或向下,改变的 为操作期间调整级别的操作显着简化,或甚至不必要的,并且操作的安全性和操作效率提高。

    METHOD OF CONSTRUCTING STRUCTURES USEFUL AS CATWALKS AND BUILDING SCAFFOLDS ON SLOPES, AND CATWALK AND BUILDING SCAFFOLD CONSTRUCTED THEREBY
    8.
    发明公开
    METHOD OF CONSTRUCTING STRUCTURES USEFUL AS CATWALKS AND BUILDING SCAFFOLDS ON SLOPES, AND CATWALK AND BUILDING SCAFFOLD CONSTRUCTED THEREBY 审中-公开
    走秀及棚架坡地并特此生产的走秀和脚手架的施工工艺

    公开(公告)号:EP1270815A4

    公开(公告)日:2004-12-15

    申请号:EP01914200

    申请日:2001-03-23

    申请人: FUKUI TOMIO

    发明人: FUKUI TOMIO

    摘要: A method of constructing catwalks and building scaffolds without cutting slopes, and without damaging mountainous areas, comprising the steps of 1) dropping at least two vertical ropes along a slope; 2) joining the vertical ropes by a set of upper and lower horizontal ropes, at a predetermined spaced interval; 3) joining these horizontal ropes to bar-like base structures; 4) erecting at least one pillar on the first base structure joined to the lower rope; 5) and placing and fixing plate-like structures on the second base structure joined to the upper horizontal rope and joined on the pillar or pillars.

    摘要翻译: 构建走秀和建筑支架而不切割斜坡的方法,且不会损坏山区,其包括如下步骤:1)落下的至少两个垂直绳索沿的斜率; 2)由一组上和下水平绳索,以预定的间隔间隔开的接合垂直绳索; 3)加入合成水平绳索棒状基部结构; 4)竖立在所述第一基体结构,以接合所述下绳索的至少一个支柱; 5)和放置并在所述第二基结构固定板样结构连接到上水平绳索并接合在柱子上的或支柱。

    Verstellbare Arbeitsbühne
    9.
    发明公开
    Verstellbare Arbeitsbühne 有权
    可调式工作平台

    公开(公告)号:EP1179647A2

    公开(公告)日:2002-02-13

    申请号:EP01117351.5

    申请日:2001-07-18

    IPC分类号: E04G3/08

    摘要: Eine bei der Errichtung von Gebäuden einsetzbare Arbeitsbühne umfaßt ein das Gebäude an seiner Außenseite umgebendes Grundgerüst (1) mit verstellbaren, an den Außendurchmesser des Gebäudes anpaßbaren Trägern (2), über welche die Arbeitsbühne an der Gebäudewand befestigbar ist, und einen vom Grundgerüst (1) getragenen Bühnenboden. Am Grundgerüst (1) sind Rollapparate (14) angebracht, welche jeweils zumindest ein Laufrollenpaar (16) aufweisen, dessen beide Laufrollen (16) frei drehbar gelagert sind, und an den Unterseiten der Bodenplatten (12,13) des Bühnenbodens sind Profilschienen (4) befestigt, die einen Horizontalsteg (5) und seitlich an diesem angeordnete, abwärts verlaufende Seitenwangen (6) umfassen, deren untere freie Enden nach innen abgewinkelt sind und horizontal nach innen verlaufende Fortsätze (7) bilden, wobei die Profilschienen (4) jeweils zumindest ein Paar von Laufrollen (16) eines Rollapparates (14) aufnehmen und entlang von diesen verschiebbar sind und wobei die Profilschienen (4) auf der von der Außenwandung (26) des Gebäudes abgewandten Außenseite der Arbeitsbühne über den Rand der jeweiligen Bodenplatte (12,13) vorragen und am vorragenden Abschnitt der Profilschiene (4) ein Abstützpfosten (18) eines Geländers befestigt ist.

    摘要翻译: 一种在建筑的建设可用工作平台包括建筑物在其外侧周边框架(1)具有可调节的,可适应建筑构件(2)的外径,通过该建筑物墙上的工作平台可以被固定,并且(骨干1 )戴舞台地板。 的主链(1)滚子装置(14),其安装,每一个具有至少一对辊(16),所述两个滚子(16)可自由转动地安装,并在舞台地板的底板(12,13)的下侧是曲线的导轨(4 )固定,其包括水平腹板(5)和横向设置于此,向下延伸的侧壁(6),其下端自由端成角度地向内,形成水平的(向内延伸的延伸部7)中,轮廓的导轨(4)各具有至少 中容纳滚子装置(14)和一对辊(16)是可移动的其沿,并且其中所述工作平台的外部,型条(4)远离所述建筑物在相应的底板的边缘的外壁(26)(12,13 )和突出(在轨道4的突出部)Abstützpfosten(18)栏杆的固定。

    Seilspanner
    10.
    发明公开
    Seilspanner 失效
    Seilspanner。

    公开(公告)号:EP0202691A2

    公开(公告)日:1986-11-26

    申请号:EP86108726.0

    申请日:1984-04-19

    IPC分类号: F16G11/12 B66D3/00

    摘要: @ Seilspanner nach mit zwei relativ zueinander bewegbaren, in Gegenphase geöffneten und geschlossenen Klemmeinheiten (101, 102), wobei der Seilspanner (15) als kompakte, mit Druckmedium betriebene Einheit ausgebildet ist, in deren Inneren die beiden Klemmeinheiten (101, 102) und ein diese relativ zueinander bewegender Arbeitszylinder (103) angeordnet sind, wobei jede der Klemmeinheiten (101, 102) mit mindestens einer Klemmvorrichtung (104) und mindestens einem an die Klemmvorrichtung angeschlossenen Arbeitszylinder (105; 106) versehen ist (Figur 1).

    摘要翻译: 具有两个夹紧单元(101,102)的电缆张紧器,其可以相对于彼此移动并以相反的相位打开和关闭,所述电缆张紧器(15)被设计为由压力介质驱动的紧凑单元,所述压力介质在其内部 布置了两个夹紧单元(101,102)和使所述单元相对于彼此移动的操作缸(103),每个夹紧单元(101,102)设置有至少一个夹紧装置(104),并且在 连接到夹紧装置的至少一个操作缸(105; 106)(图1)。