摘要:
Techniques for determining conditions of power lines in a power distribution system based on measurements collected by a plurality of sensor units deployed in the power distribution system. Techniques include obtaining first transformed data associated with a first set of one or more measurements collected by a first sensor unit in the plurality of sensor units and second transformed data associated with a second set of one or more measurements collected by a second sensor unit in the plurality of sensor units, and determining, by using at least one processor and based at least in part on one or more features calculated from the first transformed data and the second transformed data, at least one condition of at least one power line in the power distribution system.
摘要:
The invention provides a control unit (8) for power engine unit (14, 15) of the power plant. The control unit comprises inputs (44, 45, 46) to receive status data from circuit breakers (5, 6, 7), and a data bus interface (47) to send and receive data between the control units connected to a data bus. The control unit (14, 15) is arranged to determine a group of power engine units which are electrically connected with each other through a local bus bar (2, 3, 4). In case of receiving the first status data indicating the grid breaker (5) being open the control unit (8) is arranged to decide whether to generate and send a control message to open the generator breaker (5) based on predetermined criteria for said determined group of power engine units (14, 15) in such a way that one power engine unit remains to be connected to the local bus bar (2, 3, 4).
摘要:
A changeover method of a high voltage direct current (HVDC) transmission system is provided. A first system is set to an active state. A ready signal is transmitted from the first system to a first COL. A ready detection signal and an active signal are transmitted to the first system, in response to the ready signal. A confirm signal is transmitted to the first system in response to the active signal when the ready detection signal matches the ready signal.
摘要:
A system (100) for controlling a multi-feed power distribution network includes: a first controller (101) configured to control operation of a first network sector (211), the first controller (101) configured to, in response to a topology change in the first network sector causing a change in a location from which power is supplied to at least one affected network segment, transmit a message identifying the at least one affected network segment from the first controller (101) to the network without prior knowledge of any other controllers; and at least one second controller (102) configured to control operation of the at least one second network sector (212), the second controller (102) configured to receive the message, exchange configuration information regarding the at least one affected segment with the first controller (101), and automatically update the second configuration data of the second controller (102) based on the configuration information received from the first controller (101) to reflect the topology change.
摘要:
An electrical power system for a nuclear power facility includes an active alternating current (AC) power bus configured to be electrically coupled to a plurality of engineered safety feature (ESF) loads of a plurality of nuclear power systems, each of the ESF loads configured to fail to a safe position upon loss of primary AC power; a critical battery system electrically coupled to the active AC bus, the critical battery system comprising a plurality of valve regulated lead acid (VRLA) batteries; and a primary AC power source electrically coupled to the active AC bus.