METHOD AND EPOXY RESIN FOR REPAIRING A DAMAGED WOODEN CONSTRUCTION

    公开(公告)号:EP4310259A1

    公开(公告)日:2024-01-24

    申请号:EP23185883.8

    申请日:2023-07-17

    摘要: In a method for repairing a damaged wooden structure 21, in particular a partially submerged mooring post 23, a floating structure 1 is placed in the water and then a work platform 3 is hung on the floating structure 1. Thereafter a professional stands on the work platform 3 to remove the affected wood. Then a formwork is placed around the part of the pile where the affected part 25 has been removed. This formwork is equipped with a casting nozzle at the top. After filling the space in the formwork with epoxy resin through the casting nozzle, the formwork is removed and the repaired part can be finished.

    COMPOSITE BRIDGE DECK AND BRIDGE CONSTRUCTION
    67.
    发明公开
    COMPOSITE BRIDGE DECK AND BRIDGE CONSTRUCTION 审中-公开
    复合式桥面板和桥梁施工

    公开(公告)号:EP3262238A1

    公开(公告)日:2018-01-03

    申请号:EP16715919.3

    申请日:2016-02-22

    申请人: Fibercore Ip B.v.

    IPC分类号: E01D19/02 E01D19/12 E04B5/02

    摘要: A bridge construction comprises a bridge support or abutment (2) and a bridge deck (1) supported thereon, comprising a composite panel (5) with a top plastic skin (6), a bottom plastic skin (8) and a core (7) between and attached to the plastic skins. The bridge deck also comprises an edge beam (9) on at least one edge of the composite panel and resting on the bridge support. The edge beam (9) overlaps the core (7) of the composite panel (5) in the height direction, while the top plastic skin (6) has a protruding part (28) which protrudes relative to the core (7). The protruding part (28) of the top plastic skin (6) extends over and is attached to the edge beam (9).

    PREFABRICATED PIER COLUMN MEMBER WITH STEEL-CONCRETE COMPOSITE STRUCTURE

    公开(公告)号:EP3181755A4

    公开(公告)日:2017-11-15

    申请号:EP15903296

    申请日:2015-09-25

    申请人: UNIV HOHAI

    IPC分类号: E01D19/02

    CPC分类号: E01D19/02

    摘要: The invention discloses a segment-assembled type pier column member with a steel-concrete composite structure, which includes a reinforcement tube embedded in a pile cap, wherein the reinforcement tube is connected with a bottom of a lower segment of a hollow steel tube pier and is poured with concrete, and pier columns in upper and lower segments are reinforced by means of segment connecting and being embedded with local reinforcing meshes. A steel cross beam is connected with an upper segment of the hollow steel tube pier in an assembled way. A pre-stressed tensioning duct is reserved between the steel cross beam and the pier column in the upper segment. According to the present invention, a construction period and construction difficulty are reduced, a construction progress is accelerated, the connecting method is safe and reliable, and is convenient to control by adopting an assembled construction method; meanwhile, good concrete compression performance and good steel tensile property are sufficiently utilized, so that the whole member is economic and convenient, is simple and fast to construct, and has a good application prospect.

    FORM STRUCTURE OF PRECAST SEGMENT STRUCTURE AND CONSTRUCTION METHOD THEREOF
    69.
    发明公开
    FORM STRUCTURE OF PRECAST SEGMENT STRUCTURE AND CONSTRUCTION METHOD THEREOF 审中-公开
    预制段结构的形式结构及其构造方法

    公开(公告)号:EP3187658A1

    公开(公告)日:2017-07-05

    申请号:EP14900598.5

    申请日:2014-09-12

    申请人: POSCO

    发明人: LEE, Dae-Yong

    IPC分类号: E01D19/02

    摘要: The present invention provides a form structure employed for a precast segment structure that is formed by stacking segment units upward, each of which is formed by circumferentially connecting a plurality of precast segments. The form structure comprises: an inner form disposed inside a circumferential connection part between adjacent precast segments; an inner frame provided to support the inner surface of the inner form; a frame support part provided to support the inner frame formed upwardly; an outer form disposed outside the circumferential connection part between the adjacent precast segments; and a fastening member provided to support the outer surface of the outer form.

    摘要翻译: 本发明提供一种用于预制节段结构的模板结构,其通过将分段单元向上堆叠而形成,每个预制分段单元通过周向地连接多个预制分段而形成。 该模板结构包括:设置在相邻预制段之间的圆周连接部分内的内模; 内框架,其设置成支撑内模的内表面; 框架支撑部分,其被设置为支撑向上形成的内框架; 设置在相邻预制段之间的周向连接部分外侧的外部形式; 以及设置用于支撑外模的外表面的紧固部件。

    SYSTEM FOR MONITORING LEVEL VARIATIONS IN A SOIL SUBJECTED TO EROSIVE AND SEDIMENTARY AGENTS, AND MONITORING METHOD
    70.
    发明授权
    SYSTEM FOR MONITORING LEVEL VARIATIONS IN A SOIL SUBJECTED TO EROSIVE AND SEDIMENTARY AGENTS, AND MONITORING METHOD 有权
    监测系统的高度变化的一个楼层,侵蚀和沉积基金暴露和监测程序

    公开(公告)号:EP1841921B1

    公开(公告)日:2009-03-04

    申请号:EP05709190.2

    申请日:2005-01-27

    申请人: Lachesi S.r.L.

    IPC分类号: E02B3/00 E01D19/02

    CPC分类号: E01D19/02

    摘要: A system for monitoring level variations of at least one bottom region of a soil subjected to erosive and sedimentary agents, which comprises at least one monitoring element (15) fastened to said bottom, said at least one monitoring element (15) comprising sensor means for detecting a response of said at least one monitoring element (15) with respect to a stress. Said stress is a stress able to determine vibrations originating displacements of at least part of said at least one monitoring element, said response is a function of said displacements of at least part of said at least one monitoring element (15) and means (150) are provided for analysing said response with respect to a stress, identifying characteristic frequencies and correlate said characteristic frequencies with a lowering of said bottom region (20).