公开(公告)号:EP1204841A1
公开(公告)日:2002-05-15
申请号:EP00952019.8
申请日:2000-08-07
申请人: LTM Corporation
发明人: RO, Dong-Young , LEE, Chan-Woo
IPC分类号: F42D1/00
CPC分类号: E21D9/1093 , E21C37/16 , E21D9/00 , E21D9/113 , F42D3/00
摘要: A three dimensional multi-phase tunneling method and equipments thereof, make it possible that a drilling and blasting process can be carried out simultaneously during excavating a pilot tunnel by means of tunnel boring machine (TBM), thereby is capable of reducing the period and the cost of excavation. The three dimensional multi-phase tunneling method includes the steps of drilling an oblique charge hole on an upper half section in a pilot tunnel being excavated by a tunnel boring machine (TBM) and drilling an outermost charge hole to a predetermined length in a tunneling direction (longitudinal direction) at an outermost tunneling section during excavating the pilot tunnel, and charging and blasting the upper half section, wherein the oblique charge hole is turned at a predetermined angle from a transverse direction to a longitudinal direction, and charging and blasting the lower half section except the central portion apart by a predetermined distance from the tunnel face after drilling a longitudinal hole.