摘要:
A method for determining start and stop times of at least one selected operation on a pipe deployment vessel includes measuring either or both tension on a pipe deployed from a reel on the vessel and velocity of pipe motion with respect to the vessel. Rotational velocity of the reel is measured. Geodetic position of the vessel with respect to time is measured. The start and stop times of the at least one selected operation are determined from the measured tension, motion velocity, rotational velocity and geodetic position. The start and stop times are recorded.