TURMBAUWERK EINER WINDENERGIEANLAGE UND VERFAHREN ZUM STABILISIEREN EINES TURMBAUWERKS EINER WINDENERGIEANLAGE
    1.
    发明公开
    TURMBAUWERK EINER WINDENERGIEANLAGE UND VERFAHREN ZUM STABILISIEREN EINES TURMBAUWERKS EINER WINDENERGIEANLAGE 审中-公开
    塔楼建筑用于稳定塔建设风力发电站的风力发电厂和方法

    公开(公告)号:EP2893187A1

    公开(公告)日:2015-07-15

    申请号:EP13753898.9

    申请日:2013-09-03

    发明人: WAGNER, Philipp

    IPC分类号: F03D11/04

    摘要: The invention relates to a tower construction for a wind turbine, said tower construction enabling very large hub heights due to a combination of inner prestress, guying, and a torsion-resistant tower shaft. The tower construction has a tower shaft, a foundation, and a transition piece in the area of the upper end of the tower shaft, guying elements being provided which are angled in relation to a longitudinal axis (A) of the tower shaft and which extend radially outside of the exterior shell defined by the tower shaft, by means of which guying elements the tower shaft is guyed at least in some sections, characterized in that tension members are provided radially inside the exterior shell, by means of which tension members the tower shaft is vertically prestressed at least in some sections, the tower shaft being made of concrete, in particular prestressed concrete, in the area between the transition piece and the foundation. In order to better control the resonance behavior of this structure, the invention additionally proposes prestressing elements and guying elements that can be loaded with a variable tensile stress, the natural frequencies of the tower construction thus being varied and influenced to the effect that no interferences between excitation frequencies, in particular of the rotor unit of the wind generator, and the natural frequencies in particular of the tower construction occur and at the same time aerodynamic damping becomes possible.

    摘要翻译: 用于风力发电设备的塔架结构允许在内部预应力,拉索和扭转刚性轴塔架的合作非常高的轮毂高度。 塔结构具有塔轴,一个基础和在塔轴的上端的区域,他的过渡件。 盖元件是倾斜的朝向塔架轴的纵向轴线,并且所述塔轴的外皮的径向外侧延伸。 张力构件是径向外蒙皮内部至少部分垂直地预加应力塔轴。 塔轴在过渡件与基础之间的区域由预应力混凝土的。 控制共振行为,预应力和Guy元件在与一个可变的拉应力而变化,并影响该塔结构搜索的固有频率确实没有干扰的激励频率与固有频率之间产生作用,并且这样做,以空气动力学的吸收因此可以。

    MOBILE KRANVORRICHTUNG SOWIE VERFAHREN ZUR TEMPORÄREN MONTAGE EINER SOLCHEN KRANVORRICHTUNG
    4.
    发明公开
    MOBILE KRANVORRICHTUNG SOWIE VERFAHREN ZUR TEMPORÄREN MONTAGE EINER SOLCHEN KRANVORRICHTUNG 有权
    MOBILE KRANVORRICHTUNG SOWIE VERFAHREN ZURTEMPORÄRENMONTAGE EINER SOLCHEN KRANVORRICHTUNG

    公开(公告)号:EP3132137A1

    公开(公告)日:2017-02-22

    申请号:EP15715745.4

    申请日:2015-04-14

    发明人: WAGNER, Philipp

    IPC分类号: F03D1/00 B66C23/18

    摘要: The invention relates to a mobile crane device (10) for temporary assembly on an existing tower structure (12) of a wind turbine, comprising a crane tower (14) having a longitudinal axis (A) which is inclined relative to the vertical direction (16) in the assembly state of the crane device (10) on the tower structure (12) and which extends substantially vertically in an operating state of the crane device (10) assembled on the tower structure (12), a boom (18) which is pivotably attached to the crane tower (14) and which is folded down in the assembly state of the crane device (10), a crane chassis (20) which projects laterally from the crane tower (14) toward the tower structure (12) in the assembly state of the crane device (10) and which has contact means (22) by which the crane device (10) is supported on the tower structure (12) and can be displaced vertically along the latter, and a crane suspension (26) formed on the crane tower (14) for attaching a crane rope (28), to be stored on the tower structure (12), for the vertical displacement of the crane device (10), wherein the crane suspension (26) defines a force application point (P) for the crane rope (28), which in the assembly state of the crane device (10), as seen in vertical plan view, is arranged radially between the contact means (22) and the center of gravity (S) of the crane device (10), wherein, in the assembly state of the crane device (10), the crane tower (14) is freely pivotable relative to the tower structure (12) via the crane chassis (20). In addition, the invention also relates to a method for the temporary assembly of such a crane device (10) on an existing tower structure (12) of a wind turbine.

    摘要翻译: 本发明涉及一种用于临时组装在风力涡轮机的现有塔式结构(12)上的移动式起重机装置(10),其包括具有相对于垂直方向倾斜的纵向轴线(A)的起重机塔架(14) 16)在塔架结构(12)上的起重机装置(10)的组装状态下,并且在组装在塔架结构(12)上的起重机装置(10)的操作状态下基本垂直地延伸,起重臂(18) 起重机底盘(20),其从起重机塔架(14)向塔架结构(12)横向突出的起重机底盘(20),所述起重机底盘(20)可枢转地附接到所述起重机塔架(14)并且在所述起重机装置(10)的组装状态下向下折叠; ),其具有接触装置(22),所述起重机装置(10)通过所述接触装置支撑在所述塔架结构(12)上并且可以沿所述起重机装置(12)垂直移动,并且起重机悬架 (26),其形成在起重机塔架(14)上,用于附接起重机绳索(28),以便被存放 在塔架结构(12)上,用于起重机装置(10)的垂直位移,其中起重机悬架(26)限定起重机绳索(28)的施力点(P),其在 在垂直平面图中看到的起重机装置(10)径向布置在起重机装置(10)的接触装置(22)和重心(S)之间,其中,在起重机装置 起重机塔架(14)可以通过起重机底盘(20)相对于塔架结构(12)自由枢转。 此外,本发明还涉及一种用于将这种起重机装置(10)临时组装在风力涡轮机的现有塔架结构(12)上的方法。