HOLLOW PRESTRESSED CONCRETE (HPC) GIRDER AND SPLICED HOLLOW PRESTRESSED CONCRETE GIRDER (S-HPC) BRIDGE CONSTRUCTION METHOD
    1.
    发明公开
    HOLLOW PRESTRESSED CONCRETE (HPC) GIRDER AND SPLICED HOLLOW PRESTRESSED CONCRETE GIRDER (S-HPC) BRIDGE CONSTRUCTION METHOD 审中-公开
    用于生产预应力混凝土空心CARRIER(HPC CARRIER)和剪接预应力混凝土空心CARRIER BRIDGE(S-HPC BRIDGE)

    公开(公告)号:EP1802813A1

    公开(公告)日:2007-07-04

    申请号:EP05809002.8

    申请日:2005-09-24

    发明人: HAN, Man-Yop

    IPC分类号: E01D2/00

    摘要: Provided is a hollow prestressed concrete girder for forming an I-type prestressed concrete girder bridge, in which at least one hole is formed in a body portion of the I-type prestressed concrete girder. A spliced hollow prestressed concrete girder bridge, in which a plurality of holes are formed in a body portion of the girder to reduce the weight of the girder, is constructed by carrying a plurality of spliced girders manufactured in a factory to a construction site, assembling the spliced girders in the construction site, first tensing steel wires installed at the entire girder, reinforcing a connection portion between spliced members by a steel rod or steel wire which is connected by welding or using a coupling or anchoring device at the spliced portion that connecting the spliced girders, installing the assembled girders that are first tensed on a pier, installing a continuous steel wire for connecting the installed spliced girders for a continuous bridge, pouring slab in the upper portion of the installed spliced girders, after the slab is cured, second tensing steel wires that have not tensed or the tensed continuous steel wire, and when cracks are generated or excessive sagging occurs after the bridge is constructed, additionally tensing the steel wires.