VIDEO MONITORING METHOD AND SYSTEM FOR WIND TURBINE BLADE

    公开(公告)号:EP3872338A1

    公开(公告)日:2021-09-01

    申请号:EP19879097.4

    申请日:2019-06-21

    发明人: LI, Xinle YANG, Boyu

    IPC分类号: F03D17/00 G01N21/88

    摘要: A video monitoring method and system for a blade of a wind turbine are provided. The method includes: calculating a pan value and a tilt value based on each of a plurality of circular arc angles when the blade of the wind turbine is in a stationary state, wherein the plurality of circular arc angles are set based on a circular arc curve on a rotational plane of the blade, which is formed with a first point as a center and a first distance as a radius; and setting the pan value and the tilt value of a video camera to the calculated pan value and tilt value, respectively, to capture the blade.

    METHOD, DEVICE AND SYSTEM FOR CORRECTING INSTALLATION ERRORS OF WIND VANE

    公开(公告)号:EP3770611A1

    公开(公告)日:2021-01-27

    申请号:EP19889545.0

    申请日:2019-11-29

    IPC分类号: G01P21/00

    摘要: Disclosed are a method, device and system for correcting installation errors of a wind vane (11). The method for correcting installation errors of a wind vane comprises: obtaining images of unit blades (7) and an electric generator outer rotor (S101); obtaining contours of the unit blades (7) and the contour of the electric generator outer rotor from the images of the unit blades (7) and the electric generator outer rotor (S102); calculating a unit center line (12) according to the contour of the electric generator outer rotor and the contours of two blades of the unit blades (7) (S103); obtaining a point of intersection of the unit center line and the contour of the electric generator outer rotor as a first point of intersection (S104); obtaining an orientating face of a wind vane (11) (S105); determining whether the wind vane (11) is aligned with the unit center line (12) according to the unit center line and the orientating face of the wind vane (11) (S106); and if the wind vane (11) is not aligned with the unit center line (12), calculating a deviation angle between the wind vane (11) and the unit center line (12) according to the orientating face of the wind vane (11) and the first point of intersection, and correcting the orientation of the wind vane (11) according to the deviation angle between the wind vane (11) and the unit center line (12) (S107).

    METHOD AND DEVICE FOR DETERMINING TOWER CLEARANCE FOR WIND TURBINE

    公开(公告)号:EP3744974A1

    公开(公告)日:2020-12-02

    申请号:EP19890997.0

    申请日:2019-09-30

    IPC分类号: F03D17/00

    摘要: A method and device for determining a tower clearance of a wind turbine. The method comprises: acquiring an image of a wind turbine in operation (S10), the image comprising the tips of blades (2) and a tower (1) of the wind turbine; determining the positions of the tips of the blades (2) of the wind turbine in the image acquired (S20); identifying the edges of the tower (1) in the image acquired (30); and calculating, on the basis of the positions of the tips of the blades (2) and the edges of the tower (1) that have been determined, the distance from the tips (2) of the blades (2) to the edges of the tower (1) to acquire a tower clearance (S40). The employment of the method and device for determining the tower clearance for the wind turbine allows the real-time determination of the tower clearance for the wind turbine, thus effectively preventing the blades (2) from hitting the tower.

    TOWER CLEARANCE MONITORING SYSTEM AND METHOD THEREFOR

    公开(公告)号:EP3741994A1

    公开(公告)日:2020-11-25

    申请号:EP19890253.8

    申请日:2019-09-16

    IPC分类号: F03D17/00

    摘要: A tower clearance real-time monitoring system (100) and a method therefor. The tower clearance monitoring system (100) comprises an image capture device (101), a blade position processing device (102) and a core algorithm processing device (103). The image capture device (101) is used to capture an image of a wind turbine in an operating state, and the image comprises a blade portion and a tower portion; The blade position processing device (102) is used to determine whether the captured image represents valid data so as to send valid data to the core algorithm processing device (103). The core algorithm processing device (103) is used to use valid data to calculate a tower clearance value for a blade, and to send a calculation result to a wind turbine main control system (104) of a wind turbine.

    METHOD AND DEVICE FOR MONITORING ICING OF WIND TURBINE BLADE

    公开(公告)号:EP3457326A1

    公开(公告)日:2019-03-20

    申请号:EP17899223.6

    申请日:2017-11-23

    IPC分类号: G06K9/62 G06T7/00

    摘要: A method and apparatus for monitoring formation of ice on a wind turbine blade are provided. The method includes: capturing an image of the blade through a camera; detecting a region of the blade from the captured image; clearing image information of a background region from the captured image, which is in the captured image except for the region of the blade, to obtain a blade image; and inputting the obtained blade image into a recognition model of ice on a blade obtained by training on a sample set, to determine whether ice is on the captured blade, wherein the sample set comprises a plurality of blade images indicating that ice is on blades.