A method for exchanging roving bobbins applied to a ring spinning frame
    1.
    发明公开
    A method for exchanging roving bobbins applied to a ring spinning frame 失效
    一种适用于环锭纺纱机的滚筒滚筒系统

    公开(公告)号:EP0434630A3

    公开(公告)日:1991-12-18

    申请号:EP90811004.2

    申请日:1990-12-19

    IPC分类号: D01H9/00 D01H9/18

    CPC分类号: D01H9/182 D01H9/005

    摘要: In a roving bobbin exchange system applied to a ring spinning frame (1) provided with twin parallel transporting rails (4, 5) arranged at a position right above a creel portion of each side of the ring spinning frame (1), for supporting a bobbin carriage (8) provided with bobbin hangers (15) arranged in twin parallel alignment, when roving bobbins (B) held by a bobbin carriage (8) supported by one of the twin transporting rails (4, 5) , from which rovings are supplied to the respective draft units at one side of the spinning frame, reach an almost exhausted conditions, another bobbin carriage (8) holding full packaged roving bobbins (A) is introduced to the other one of the twin transporting rails (4, 5), and when the roving bobbins of the first bobbin carriage reach an almost exhausted condition, successive unit operations of exchanging rovings being supplied to the corresponding draft units are carried out between each exhausted roving bobbin (B) of the first bobbin carriage (8) and the corresponding one of the full packaged roving bobbins (A) of the second bobbin carriage (8), from one side of the alignment of the draft units to the other side thereof, and then the bobbin carriage (8) on the first transporting rail is discharged therefrom.

    A method for exchanging roving bobbins applied to a ring spinning frame
    3.
    发明公开
    A method for exchanging roving bobbins applied to a ring spinning frame 失效
    系统zum Auswechseln von Vorgarnspulen在Ringspinnmaschinen。

    公开(公告)号:EP0434630A2

    公开(公告)日:1991-06-26

    申请号:EP90811004.2

    申请日:1990-12-19

    IPC分类号: D01H9/00 D01H9/18

    CPC分类号: D01H9/182 D01H9/005

    摘要: In a roving bobbin exchange system applied to a ring spinning frame (1) provided with twin parallel transporting rails (4, 5) arranged at a position right above a creel portion of each side of the ring spinning frame (1), for supporting a bobbin carriage (8) provided with bobbin hangers (15) arranged in twin parallel alignment, when roving bobbins (B) held by a bobbin carriage (8) supported by one of the twin transporting rails (4, 5) , from which rovings are supplied to the respective draft units at one side of the spinning frame, reach an almost exhausted conditions, another bobbin carriage (8) holding full packaged roving bobbins (A) is introduced to the other one of the twin transporting rails (4, 5), and when the roving bobbins of the first bobbin carriage reach an almost exhausted condition, successive unit operations of exchanging rovings being supplied to the corresponding draft units are carried out between each exhausted roving bobbin (B) of the first bobbin carriage (8) and the corresponding one of the full packaged roving bobbins (A) of the second bobbin carriage (8), from one side of the alignment of the draft units to the other side thereof, and then the bobbin carriage (8) on the first transporting rail is discharged therefrom.

    摘要翻译: 在应用于环锭纺纱架(1)的粗纱筒交换系统中,该环锭纺纱架(1)设置有布置在环锭纺纱机(1)的每一侧的纱架部分正上方的位置处的双平行输送轨道(4,5),用于支撑 当由由两个运输轨道(4,5)中的一个支撑的梭芯托架(8)保持的粗纱线筒(B)时,设置有以双平行排列的线轴架(15)的梭芯架(8) 供给到纺纱架一侧的各牵伸单元达到几乎耗尽的状态,将另一个保持完整包装的粗纱筒管(A)的筒管架(8)引入到另一个双输送轨道(4,5)中, 并且当第一梭管架的粗纱线筒达到几乎耗尽的状态时,在第一筒管架(8)的每个排出的粗纱筒(B)和第一筒管架(8)的排出的粗纱筒(B)之间进行连续单元操作,供给到相应的牵伸单元, 第二梭芯托架(8)的完全包装的粗纱线筒(A)中的相应一个,从拔模单元的对准的一侧到另一侧,然后在第一输送轨道上的筒管架(8) 从中排出。