摘要:
In a ring spinning frame provided with two parallel alignments of bobbin hangers 8, a plurality of roving guides 30 is arranged in an alignment at an intermediate position between the two alignments of bobbin hangers 8, wherein a first group of roving guides 30 is formed by roving guides 30 alternately positioned in the roving guide arrangement and a second group of roving guides 30 is formed by the remained roving guides 30 thereof, an improved creel mechanism 40 for relatively displacing the first group of roving guides 30 and the second group of roving guides 30 whereby a first intervening space between two adjacent roving guides 30 and a second intervening space between two adjacent roving guides 30 are alternately formed along the alignment of the roving guides 30, wherein the first intervening space ensures a free passage of a full packaged roving bobbin FB but the second intervening space does not permit a free passage of the full packaged roving bobbin FB, the above-mentioned formation of two intervening spaces being created alternately, at each intervening space between two adjacent roving guides 30, by the reciprocal motion of the displacing mechanism 40.
摘要:
A method and apparatus for synchronously piecing rovings (S1, S2) applied to a ring spinning frame in combination with a known system of transporting rovings bobbins by bobbin carriages (9) between a roving room and a spinning room, wherein rovings (S1) supplied from corresponding roving bobbins of a bobbin carriage (9) in a creel portion of the ring spinning frame are synchronously pieced with corresponding supplemental rovings (S2) taken from respective full packaged roving bobbins held by another bobbin carriage (9) in the creel portion of the ring spinning frame.
摘要:
A method for exchanging roving bobbins in a spinning frame, wherein a unit operation includes a series of step operations for exchanging a pair of almost exhausted robing bobbins (2B, 2F) suspended by front and back bobbin hangers (12) facing each other in the creel for two adjacent full packaged roving bobbins, corresponding to the above pair of roving bobbins (1), of the supply rail (13) arranged at a position in front and above the creel. The unit operation is intermittently but successively carried out along the spindle alignment of the spinning frame from one side-end to the other. In this unit operation, it is inevitable to use a pair of pegs (35, 36) for supporting a pair of roving bobbins in a manner allowing changing of the axial distance of these pegs between a distance identical to an axial distance between a front bobbin hanger and a back bobbin hanger, facing each other in the creel, and a distance indentical to an axial distance between two adjacent bobbin hangers on the supply rail (13). Also, an apparatus provided with a peg unit (40) having the above two pegs (35, 36) together with mechanism (60) for changing the axial distance between these two pegs. Th e apparatus is further provided with an additional mechanism (70) for displacing the peg unit to desired positions to carry out the unit operation for exchanging roving bobbins, and a mechanism (90) for displacing the apparatus along the spinning frame to carry out the successive unit operations for exchanging roving bobbins from one side-end to the other of the spinning frame.
摘要:
In a method for piecing rovings and exchanging almost exhausted roving bobbins by full packaged roving bobbins according to the present invention, when the roving bobbins suspended by the respective bobbin hangers, and arranged in two rows on the creel of the spinning frame in such a manner that each bobbin hanger in a front row faces a corresponding bobbin hanger in a back row, have become almost exhausted, in each pair of roving bobbins suspended by one of the above-mentioned bobbin hangers of the front row and one of the bobbin hangers of the back row facing each other, rovings supplied from the above-mentioned roving bobbins of the front and back rows to the corresponding draft parts are pieced at positions upstream of the draft parts, respectively, with the respective rovings from two corresponding full packaged roving bobbins which are suspended adjacently by bobbin hangers of a supply rail, which is arranged at a position in front of and above the above-mentioned creel and in parallel therewith, and thereafter, these pairs of almost exhausted roving bobbins and the corresponding pairs of full packaged roving bobbins, which have completed the piecing operation, are exchanged. In the working machine of the present invention, a first apparatus for carrying out the above-mentioned unit operation of piecing rovings and a second apparatus for carrying out the above-mentioned unit operation for exchanging two almost exhausted roving bobbins facing each other in the creel of the spinning frame by two corresponding full packaged roving bobbins of the supply rail are, in the preferred embodiment, mounted together in incorporated condition, a device for introducing pair of rovings from the above-mentioned full packaged roving bobbins to corresponding two roving guides before working the second apparatus is also mounted.
摘要:
An improved method and apparatus for carrying out a roving bobbin exchange operation when applied to a conventional ring spinning frame. The roving bobbin exchange operation is simultaneously carried out on a plurality of successive pairs of a front bobbin hanger 7a and a back bobbin hanger 7b of the creel portion of the spinning frame by intermittently displacing the operation unit 20 along the spinning frame and by utilizing a plurality of pairs of a first sub-peg unit 30a having a front peg 32 and a back peg 41, and a second sub-peg unit 30b having a front peg 32 and a back peg 41 unit, whereby a roving bobbin mounted on the front peg 32 of the first sub-peg unit 30a can be transferred to the back peg 41 of the second sub-peg unit 30b, and vice versa, during the exchange operation, and thus the unit roving bobbin exchange operation can be carried out in a very limited space defined by twice a pitch between two adjacent pairs of a front bobbin hanger 7a and a back bobbin hanger 7b facing the first bobbin hanger.