SYSTEM, VERFAHREN UND EISENBAHNWAGEN ZUM GLEISGEBUNDENEN TRANSPORT VON GEGENSTÄNDEN
    1.
    发明公开
    SYSTEM, VERFAHREN UND EISENBAHNWAGEN ZUM GLEISGEBUNDENEN TRANSPORT VON GEGENSTÄNDEN 审中-公开
    系统,VERFAHREN UND EISENBAHNWAGEN ZUM GLEISGEBUNDENEN运输VONGEGENSTÄNDEN

    公开(公告)号:EP2709893A1

    公开(公告)日:2014-03-26

    申请号:EP12722128.1

    申请日:2012-05-15

    IPC分类号: B61D15/00

    摘要: The invention relates to a system and method for the rail-bound transportation of objects, e.g. for delivering or collecting material to and/or from railway working vehicles, comprising several interconnected railway carriages (1), which respectively comprise at least one conveyor track (6, 7) on which the objects can be driven in a longitudinal manner in relation to the railway carriages (1) and which are designed such that the conveyor tracks (6, 7) join together the interconnected railway carriages (1). According to the invention, said system comprises conveyor bodies (8) for the objects, said bodies being designed to move from one railway carriage (1) to another railway carriage (1) along the conveyor tracks (6, 7) which are connected one to the other. The invention also relates to suitable railway carriages therefor.

    摘要翻译: 本发明涉及一种用于轨道运输物体的系统和方法,例如, 用于向铁路工作车辆和/或从铁路工作车辆运送或收集材料,其包括多个互连的铁路车厢(1),其分别包括至少一个输送轨道(6,7),物体可以相对于纵向移动 铁路车厢(1),其被设计成使得输送机轨道(6,7)将互连的铁路车厢(1)连接在一起。 根据本发明,所述系统包括用于物体的输送机体(8),所述主体被设计成沿着输送轨道(6,7)从一个铁路支架(1)移动到另一个铁路支架(1) 到另一个 本发明还涉及其适用的铁路车厢。

    SYSTEM ZUM GLEISGEBUNDENEN TRANSPORT VON GEGENSTÄNDEN
    3.
    发明公开
    SYSTEM ZUM GLEISGEBUNDENEN TRANSPORT VON GEGENSTÄNDEN 审中-公开
    SYSTEM ZUM GLEISGEBUNDENEN TRANSPORT VONGEGENSTÄNDEN

    公开(公告)号:EP2904151A1

    公开(公告)日:2015-08-12

    申请号:EP13786486.4

    申请日:2013-11-06

    IPC分类号: E01B27/00

    CPC分类号: E01B27/00

    摘要: A system for track-bound transportation of objects comprises a plurality of rail cars (1, 1') which can be coupled to one another and each have at least one transportation belt (6) on which the objects can be moved along the rail car (1, 1') and which is embodied in such a way that the transportation belts (6) of rail cars (1, 1') which are coupled to one another adjoin one another, wherein transportation bodies (8) for the objects are provided, said bodies being formed from one rail car to another rail car in order to permit transportability along transportation belts which adjoin one another. At least one of the rail cars has a transfer module (13) with an extraction device (14) for extracting the objects from the transportation bodies (8).

    摘要翻译: 一种用于轨道运输物体的系统,包括多个轨道车(1,1'),所述多个轨道车可以彼此耦合并且每个轨道车具有至少一个运输带(6),物体可以沿着轨道车 (1,1'),并且其构造成使得彼此联接的轨道车(1,1')的输送带(6)彼此相邻,其中用于所述物体的输送体(8)是 所述车身由一个有轨车厢形成到另一个有轨车厢,以便允许沿着彼此相邻的运输带的可运输性。 至少一个轨道车具有带有用于从运输本体(8)提取物体的提取装置(14)的传输模块(13)。

    EISENBAHNARBEITSFAHRZEUG
    4.
    发明公开

    公开(公告)号:EP2709892A1

    公开(公告)日:2014-03-26

    申请号:EP12720534.2

    申请日:2012-05-15

    IPC分类号: B61D15/00

    摘要: The invention relates to a railway work vehicle comprising a chassis supported by a drive mechanism and work devices supported by the chassis. According to the invention, the transportation of material within the work vehicle below and/or above and/or next to the working devices can be improved by using at least one conveyor track on which conveyor bodies for objects or objects forming conveyor bodies, in the form of a parcelled goods, can be driven along the working vehicle.

    摘要翻译: 本发明涉及一种铁路车辆,其包括由驱动机构支撑的底盘和由底盘支撑的作业装置。 根据本发明,可以通过使用至少一个输送轨道来改善工作车辆下方和/或上方和/或旁边的材料的运输,在该输送轨道上,用于形成输送机主体的物体或物体的输送机体 形式的混合货物,可以沿着工作车辆行驶。

    SCHIENENGEBUNDENES TRANSPORTSYSTEM FÜR EINE GLEISBAUMASCHINE
    7.
    发明公开
    SCHIENENGEBUNDENES TRANSPORTSYSTEM FÜR EINE GLEISBAUMASCHINE 有权
    铁路BOUND运输系统轨道施工机械

    公开(公告)号:EP2920366A1

    公开(公告)日:2015-09-23

    申请号:EP13798597.4

    申请日:2013-11-14

    IPC分类号: E01B27/00 E01B27/08

    摘要: In a method for restoring, renovating or rebuilding a railway which comprises a substructure, a track bed and a track grid which is laid thereon and has rails and sleepers, a substructure or part of a substructure is installed, a track bed is installed and a track grid is installed and/or an existing track grid is extended, an existing track bed is extended and an existing substructure or part of a substructure is extended. There is provision that the installation of the track grid, the installation of the track bed and the installation of the substructure or part of the substructure takes place in a single working process and/or in that the extension of the existing track grid, the extension of the existing track bed and/or the extension of the existing substructure or part of the substructure takes place in a single working process. Track bed material and/or substructure material is transported to the site and/or away from the site by rail.