摘要:
According to one embodiment, an energy consumption management system includes: a movement information creating device; a power consumption amount measuring device; an accumulating device; and a display device. The movement information creating device creates movement information regarding a person in a management target area. The power consumption amount measuring device measures a power consumption amount of an instrument in the management target area. The accumulating device creates management information in which the movement information and a power consumption amount measurement value measured are associated with each other. The display device displays the management information.
摘要:
According to one embodiment, a monitoring system is provided, which has a personal authentication unit (5) and a camera (7). The personal authentication unit (5) is provided near a security gate (3) and authenticates a person allowed to pass through the security gate (3). The camera (7) photographs an area near the security gate (3), in which the personal authentication unit (5) is provided. The monitoring system further has a data generation unit (5, 6) configured to generate personal attribute data about the person authenticated by the personal authentication unit (5), a person identification unit (80, 81) configured to identify the person authenticated, on the basis of video data generated by the camera (7), and a monitoring data generation unit (82, 83) configured to generate monitoring data composed of video data and metadata. The video data represents an image including the person identified by the person identification unit (80, 81). The metadata is associated with the video data and containing the personal attribute data.
摘要:
A power consumption management system includes power consumption managers (30-1,30-2,30-3) and a power supply manager (10). Each of the power consumption managers (30-1,30-2,30-,3) creates changeable power amount information with respect a planned value of power consumption for each predetermined time range in a preset predetermined period in future, the planned value being related to a load of each piece of equipment in a building (A,B,C) as a monitoring target. The power supply manager (10) is connected to each of the power consumption managers (30-1,30-2,30-3) through a network, decides a power change request amount for each building (A,B,C) based on the created changeable power amount information, and transmits the decided power change request amount to each of the power consumption managers (30-1,30-2,30-3) for the purpose of notification.
摘要:
According to one embodiment, a scheduling apparatus sends queries to communication modules (20) in buildings (2) and receives facility information measured at monitor-control points (21) from the communication modules (20). As for each communication module (20), a network address, a waiting time to receive the facility information after sending a query, and a connection with the monitor-control points (21), are stored. When a service request indicating at least one monitor-control point (21) is received, queries each including the network address of a communication module (20) connected with a monitor-control point (21) indicated by the service request, are generated. A priority of each query is decided based on the waiting time corresponding to the communication module (20). Each query is added to a first send queue or a second send queue based on the priority. When queries are sent, a timing to send from the first send queue is same as or earlier than a timing to send from the second send queue.
摘要:
A power consumption management system includes power consumption managers (30-1,30-2,30-3) and a power supply manager (10). Each of the power consumption managers (30-1,30-2,30-,3) creates changeable power amount information with respect a planned value of power consumption for each predetermined time range in a preset predetermined period in future, the planned value being related to a load of each piece of equipment in a building (A,B,C) as a monitoring target. The power supply manager (10) is connected to each of the power consumption managers (30-1,30-2,30-3) through a network, decides a power change request amount for each building (A,B,C) based on the created changeable power amount information, and transmits the decided power change request amount to each of the power consumption managers (30-1,30-2,30-3) for the purpose of notification.
摘要:
According to an embodiment, provided is an air conditioning control system having a remote controller which collectively controls air conditioning facilities respectively provided in multiple buildings through a network. A building monitoring and controlling device is provided in each of the buildings. The building monitoring and controlling device monitors an air conditioning facility in a building where the building monitoring and controlling device itself is installed, and transmits operation data on the air conditioning facility to the remote controller. The remote controller calculates each operation setting value based on each set of operation data, and transmits the calculated operation setting value to the building monitoring and controlling device corresponding to the calculated operation setting value. The building monitoring and controlling device which has received the operation setting value controls the air conditioning facility by transmitting the operation setting value to the air conditioning facility.
摘要:
According to one embodiment, an illumination control system includes a motion sensor and a central management server. The motion sensor acquires position information and action information of a person. The central management server holds holding position information of an illumination unit and necessary light amount information for action information of the person, acquires a necessary amount of light corresponding to the action information of the person based on the necessary light amount information, calculates a brightness control amount based on the position information of the illumination unit, and controls the illumination unit using the brightness control amount.
摘要:
According to one embodiment, a scheduling apparatus sends queries to communication modules (20) in buildings (2) and receives facility information measured at monitor-control points (21) from the communication modules (20). As for each communication module (20), a network address, a waiting time to receive the facility information after sending a query, and a connection with the monitor-control points (21), are stored. When a service request indicating at least one monitor-control point (21) is received, queries each including the network address of a communication module (20) connected with a monitor-control point (21) indicated by the service request, are generated. A priority of each query is decided based on the waiting time corresponding to the communication module (20). Each query is added to a first send queue or a second send queue based on the priority. When queries are sent, a timing to send from the first send queue is same as or earlier than a timing to send from the second send queue.