-
1.
公开(公告)号:EP3316263A4
公开(公告)日:2018-06-27
申请号:EP17750099
申请日:2017-01-27
发明人: SAKATA HIDEYUKI , HIRAI SHIGETO , ASAHARA TAIKI , OGINO TAKAFUMI , KIRITA AKIRA , TODA AKIHIRO , IINO MASAMICHI , SATO TOSHIHIRO , TANAKA YUTAKA , OKAZAKI TAKANORI , NAKAHARA TAKASHI
IPC分类号: G21C15/18 , F15C1/16 , G21C15/243
CPC分类号: G21C15/18 , F15C1/16 , G21C15/243 , Y02E30/40
摘要: To include a cylindrical vortex chamber 35, a small flow-rate pipe 37 connected to a peripheral plate 35C of the vortex chamber 35 along a tangential direction thereof, a large flow-rate pipe 36 connected to the peripheral plate 35C with a predetermined angle with respect to the small flow-rate pipe 37, an outlet pipe connected to an outlet 39 formed in a central part of the vortex chamber 35, and a straightening plate 50 that is arranged in a part between the outlet 39 and the peripheral plate 35C of the vortex chamber 35, and when jets flow into the vortex chamber 35 from the small flow-rate pipe 37 and the large flow-rate pipe 36, straightens impinging jets from the small flow-rate pipe 37 and from the large flow-rate pipe 36 having flowed into the vortex chamber 35 toward the outlet 39.
-
2.
公开(公告)号:EP3316264A4
公开(公告)日:2018-07-11
申请号:EP17750100
申请日:2017-01-27
发明人: IINO MASAMICHI , HIRAI SHIGETO , ASAHARA TAIKI , OGINO TAKAFUMI , KIRITA AKIRA , TODA AKIHIRO , SAKATA HIDEYUKI , TANAKA YUTAKA , TOKUNAGA SETSUO , NAKAHARA TAKASHI , OKAZAKI TAKANORI
IPC分类号: G21C15/18 , F15C1/16 , G21C15/243
CPC分类号: G21C15/18 , F15C1/16 , G21C15/243 , Y02E30/40
摘要: To provide a flow damper 34 including a cylindrical vortex chamber 35, a small flow-rate pipe connected to a peripheral plate 35C of the vortex chamber 35 along a tangential direction thereof, a large flow-rate pipe connected to the peripheral plate 35C with a predetermined angle with respect to the small flow-rate pipe, an outlet pipe connected to an outlet formed in a central part of the vortex chamber 35, and a pressure equalization pipe 50 with respective ends 50A being connected to the peripheral plate 35C on opposite sides of the outlet and at positions closer to a connection portion between the small flow-rate pipe and the large flow-rate pipe than positions facing each other, putting the outlet therebetween. The pressure equalization pipe 50 is arranged such that at least a part thereof is located at a higher position than a top plate 35A of the vortex chamber 35, and an outgassing hole 51 is provided at an uppermost part 50D of the pressure equalization pipe 50.
-