-
公开(公告)号:EP3076123B1
公开(公告)日:2017-12-13
申请号:EP15382155.8
申请日:2015-03-30
发明人: Montaño Rueda, Luis Diego , Niekerk, Hendrik Van , Botija González, José Manuel , Zabalo Arena, Íñigo
CPC分类号: G01R1/067 , F41A19/58 , F42B3/122 , F42C11/02 , F42C15/40 , F42C19/00 , F42C21/00 , G01R1/30 , G01R31/048 , H01R13/6276 , H01R13/637
摘要: Method for the validation of a fuse head (1) in an electronic detonator, wherein said detonator comprises: a reference resistor (R13), a fuse head (1), at least one capacitor and switching means, wherein in a first position of the switching means, the reference resistor is connected to the at least one capacitor forming a first RC circuit, and in a second position of the switching means, the fuse head is connected to the at least one capacitor forming a second RC circuit; the method comprising the following steps: measuring at least once a first charge time; activating the switching means to the second position to replace the reference resistor in the RC circuit with the fuse head; measuring at least once a second charge time; and determining the deviation of the second charge time from the first charge time.
-
公开(公告)号:EP3076123A1
公开(公告)日:2016-10-05
申请号:EP15382155.8
申请日:2015-03-30
发明人: Montaño Rueda, Luis Diego , Niekerk, Hendrik Van , Botija González, José Manuel , Zabalo Arena, Íñigo
CPC分类号: G01R1/067 , F41A19/58 , F42B3/122 , F42C11/02 , F42C15/40 , F42C19/00 , F42C21/00 , G01R1/30 , G01R31/048 , H01R13/6276 , H01R13/637
摘要: Method for the validation of a fuse head (1) in an electronic detonator, wherein said detonator comprises: a reference resistor (R13), a fuse head (1), at least one capacitor and switching means, wherein in a first position of the switching means, the reference resistor is connected to the at least one capacitor forming a first RC circuit, and in a second position of the switching means, the fuse head is connected to the at least one capacitor forming a second RC circuit; the method comprising the following steps: measuring at least once a first charge time; activating the switching means to the second position to replace the reference resistor in the RC circuit with the fuse head; measuring at least once a second charge time; and determining the deviation of the second charge time from the first charge time.
摘要翻译: 一种用于在电子雷管中验证保险丝头(1)的方法,其中所述雷管包括:参考电阻器(R13),熔丝头(1),至少一个电容器和开关装置,其中在所述第一位置 开关装置,所述参考电阻器连接到形成第一RC电路的所述至少一个电容器,并且在所述开关装置的第二位置,所述熔丝头连接到形成第二RC电路的所述至少一个电容器; 该方法包括以下步骤:至少测量一次第一充电时间; 将开关装置激活到第二位置以用熔断器头代替RC电路中的参考电阻; 至少测量一次第二次充电时间; 以及确定第二充电时间与第一充电时间的偏差。
-