-
公开(公告)号:EP2342380A1
公开(公告)日:2011-07-13
申请号:EP09755135.2
申请日:2009-05-28
申请人: Metso Paper, Inc.
发明人: ÖDMARK, Leif , LÖVGREN, Hans
摘要: The invention relates to a twin wire press (2) for dewatering a fibre suspension, comprising a lower wire (8) and an upper wire (10) between which a fibre web (F) is formed. An arrangement of rolls (4) comprises a first dewatering control means (22) having a dewatering element (24) forming a press nip (25) with a first roll (26) (or a second dewatering control means), where the element and the first roll, (or alternative second control means), along a section of the press nip where they bear on each other, are adapted to each other to provide a thickness profile designed to provide a dewatering profile, and where the element presses the formed web (F) against the first roll, or the alternative second control means, via the wires, whereby water pressed from the web is drained through the element. The invention also concerns a method for dewatering a fibre suspension.
-
公开(公告)号:EP2092117A1
公开(公告)日:2009-08-26
申请号:EP07808845.7
申请日:2007-09-26
申请人: Metso Paper, Inc.
发明人: LÖVGREN, Hans , ÖDMARK, Leif
IPC分类号: D21F1/00
摘要: The present invention relates to a twin-wire press (50) for dewatering of a fibre suspension, comprising an endless lower wire (1.0) and an endless upper wire (12), an upper wire guiding member (20), a lower wire guiding member (18), such that a tapering dewatering space (6) is formed between the upper and lower wire guiding members, and sealing members (54) extending from an inlet box (8). The sealing members (54) in the twin-wire press comprises an upper and lower substantially form-stable sealing element (54', 54''), respectively, that in the tapering space (21) between the upper and lower wire guiding members (18, 20) is sealingly arranged against the upper and lower wire (10, 12), respectively.
摘要翻译: 本发明涉及一种用于纤维悬浮液脱水的双网压榨机(50),其包括环形下部网(1.0)和环形上部网(12),上部线引导构件(20),下部线引导 (18),从而在上部和下部金属丝引导部件之间形成锥形脱水空间(6),以及从入口箱(8)延伸的密封部件(54)。 双网压榨机中的密封构件(54)分别包括上部和下部大致形状稳定的密封元件(54',54“),在上部和下部线材引导构件 (18,20)分别密封地布置在所述上线和下线(10,12)上。
-