-
公开(公告)号:EP4442989A1
公开(公告)日:2024-10-09
申请号:EP23166531.6
申请日:2023-04-04
Applicant: Nordex Energy SE & Co. KG
Inventor: Drossel, Detlef , Phan-Graebitz, Björn , Müller, Sarah
IPC: F03D7/02
CPC classification number: F03D7/0288 , F03D7/0292
Abstract: The method is for operating a wind turbine (100) comprising at least one wind turbine component (1, 2, 3) and a setting system (31, 32) which is configured to execute at least two different measures for reducing the likelihood of overloading at least one wind turbine component. The method comprises a step in which first trigger information (Ia1) is provided, wherein the first trigger information is representative of whether the likelihood of overloading at least one wind turbine component exceeds a first threshold. If this is the case, a first output signal (OS1) is generated which is configured to cause the setting system to execute a first measure for reducing the likelihood of overloading at least one wind turbine component. In a further step, a second trigger information (Ia2) is provided which is representative of whether the likelihood of overloading at least one wind turbine component exceeds a second threshold after the first measure has been executed. If this is the case, a second output signal (OS2) is generated which is configured to cause the setting system to execute a second measure for reducing the likelihood of overloading at least one wind turbine component.